It can also be used in pile-driving, well-drilling and etc.
并可用作打桩、打水井等作业,其应用比较广泛。
Once done, even in pile up more regret and frustration in my heart, didn't help either.
曾经做过的事,就算是在心里堆积了再多的懊悔与沮丧,也于事无补。
The application situations of controlled blasting techniques in pile hole boring are introduced.
通过实例介绍了控制爆破技术在桩孔开挖工程中的应用情况。
The settlement of pile top in pile foundationconsists of pile compression and settlement of substratum.
采用实体深基础法的思想,桩顶沉降分为桩身压缩和桩端沉降。
Measures to overcome negative friction caused by the collapse of loess in pile foundation are recommended.
为了防止桩基因黄土地基湿陷而产生负摩擦力,介绍了克服桩基负摩擦力的措施。
The shortage of bearing capacity is often encountered in pile foundation construction in complex schist area.
复杂片岩地区的桩基工程常出现桩基承载力不足的问题。
The bearing capacity and settlement of the piles with sediment in pile tip is reduced as the thickness of sediment increases.
含有沉渣的桩基随着沉渣厚度的增加其承载力也不断降低,桩沉降越来越大。
By taking a series of technical measures in pile foundation design and construction, the project was implemented successfully.
在桩基的设计及施工中,通过采取一系列的技术措施使得该工程顺利实施。
Due to the important infection in using foundation, the negative friction in pile has became one of the engineering skill focus.
鉴于负摩擦力对桩基础应用过程中的重要影响,桩基础的负摩擦力已经成为基础工程界的一个技术热点。
Different wave shapes can be acquired in pile foundation with small strain by means of different types of instruments for detecting.
采用抗混滤波器的检测仪与普通滤波器检测仪进行桩基低应变检测时,得到的波形不尽相同。
Changes in surface appearance are often more of a problem than is fabric rupture in pile fabrics such as corduroy, velvet, or velveteen.
对某些织物说,例如起绒织物包括灯芯绒、平绒和棉平绒等,外观的改变比起织物的破损还要重要。
The construction features of bored pile foundation of bridge are introduced and significant parameter in pile construction quality control.
介绍了桥梁钻孔桩施工特点,成桩质量控制中注意的主要参数。
The issue of pile-soil interaction is the research hotspot and difficult subject in pile foundation engineering for recently several years.
桩土相互作用问题是近年来桩基工程中的研究热点与难点课题。
The horizontal lateral displacement of reinforced concrete or rail anti-slide piles is measured by setting up borehole incline-tube in pile.
通过在大截面钢筋混凝土和钢轨抗滑桩身埋设钻孔测斜管,监测得二类抗滑桩的水平侧向位移。
Driven pile is widely used in pile foundation and how to get it's ultimate bearing capacity is one of the problem that should be determined at first.
锤击桩是桩基工程中广泛使用的一种沉桩方法,确定其单桩极限承载力是桩基工程设计中需首要解决的问题之一。
Abgstract Through The analysis of measured low strain wave shape curve for pile foundation. The wave characteristics of shallow defeats in pile is shown.
通过对基桩低应变实测波形曲线的分析,说明桩身浅部存在缺陷的波形特征。
Test results proved that this method is proper for many conditions, can provide design supports for designers and has advantages in pile foundation tests.
试验结果表明,该法可适用于多种条件,为设计单位提供了设计依据,显示了其在桩基测试中的优越性。
This paper illustrates principle of the peculiarity of signal test based on wavelet analysis, and extracts the peculiarity of signal test in pile foundation.
本文阐述了利用小波分析来检测信号的奇异特征的原理,并对桩基础检测信号的奇异性进行了提取。
By comparing the calculation result with the field measured value, effective stress iterative method is verified to be simple and practical and can be used in pile foundation design.
通过对试算结果与实测结果的对比,说明有效应力迭代算法是一种简单实用的方法,可用于指导桩基础的设计。
The stress - wave reflection method exist limitation in testing the quality of foundation pile. The direction of defects in pile body exerts a tremendous influence on testing results.
应力波反射法在检测基桩质量的应用上存在着方法上的局限,且桩身缺陷的方向性对检测结果影响极大。
Engineering accidents often occur due to negative skin friction in pile foundation engineering. The research on problems of negative skin friction has been paid more and more attention.
工程中,因负摩阻力问题造成工程事故屡有发生,负摩阻力问题相关研究现在越来越受到重视。
Objective: To study clinical importance of casting pile-core crown with negative pressure suction silastic impressions and analyze reasons for the failure of routine impressions in pile-core crown.
目的:探讨铸造桩核冠常规印模过程中失败的原因,研究负压抽吸硅橡胶印模应用于铸造桩核冠的临床意义。
Based on practice of excavating piles, the reasons conditions and preventive measures about damage by blasting on supporting rocky layer, pillar ground support and concrete in pile have been proposed.
依据大量掘桩实践,论述了掘桩爆破对持力岩层、护壁、桩间岩柱、邻桩支护和新浇砼损伤的原因、条件和防范措施。
As one reader put it, "We just put all the bills in a pile, then try to decide which to pay."
正如一位读者所说:“我们只是把所有的账单都堆在一起,然后再决定该付哪一笔。”
As one reader put it, "We just put all the bills in a pile, and try to decide which to pay."
正如一位读者所说:“我们只是把所有的账单都堆在一起,然后再试着决定该付哪一笔。”
In Dujiangyan, a large mechanical digger scoops slabs of concrete and twisted metal rods from a massive pile of rubble.
在都江堰,一台大型挖掘机从一大堆碎石中铲出混凝土板和扭曲的金属杆。
He put the pile of chips in the centre of the table and drew a card.
他把那堆筹码放在桌子中间,然后抽了一张牌。
She looked in horror at the mounting pile of letters on her desk.
她惶恐地望着桌子上堆积如山的信函。
Running in, she beheld a pile of books and papers on the floor, with the table-cover on top.
她跑进去,看见地上有一堆书和纸,上面还有桌布。
Running in, she beheld a pile of books and papers on the floor, with the table-cover on top.
她跑进去,看见地上有一堆书和纸,上面还有桌布。
应用推荐