Hydropower installation is an important link in the construction of high-rise hydropower, which has great influence on the overall effect of high-rise building.
水电安装是高层水电施工中的一个重要环节,它对高层建筑的整体效果影响较大。
In depth study of high-rise building hydropower installation and construction technology is an inevitable choice to enhance the level of high-rise building construction.
深入研究高层建筑水电安装施工技术是提升高层建筑施工水平的必然选择。
This paper will start from various partial system of hydropower installation to fully analyze the key points of the construction of high-rise building hydropower installation.
本文将从水电安装的各个分系统出发来全面分析高层建筑水电安装的施工要点。
Abstract: this paper discusses the construction engineering hydropower installation of the problems existing in, and then puts forward some effective measures for relevant personnel reference.
摘要:本文论述了建筑工程水电安装中普遍存在的问题,然后提出了一些有效的对策,以供相关人员参考。
The preparation matters and installation technologies above water for the radial gate and bulkhead gate of Tongwan Hydropower Station are described.
介绍铜湾水电站溢流坝弧形闸门及检修闸门在水上安装前的准备工作及安装方法。
The installation capacity analysis of hydropower plant of giantt type is challenging and difficult because it involves many aspects.
大型水电站装机容量论证工作具有相当技术难度和挑战性,涉及面广。
It mainly introduces the design, manufacture, installation, adjusting and application of flexible roof for hydropower station workshop building of Dayuandu Junction.
介绍大源渡枢纽水电站厂房活动屋盖的设计、制造、安装、调试及使用情况。
Hydropower Station Gantry Crane: mainly used for lifting and opening and closing gates, but also the installation.
水电站龙门起重机:主要用来吊运和启闭闸门,也可进行安装作业。
This paper introduces the concept and the method of calculating installation sequential capacity for run-of-river hydropower stations.
提出了径流式水电站安装时序容量的概念和计算方法。
Longtan hydropower station is large in big structure size of spiral case, high in installation accuracy and welding requirement, poor in welding environment, and short in construction period.
龙滩水电站机组蜗壳结构尺寸大,安装精度和焊接要求高,焊接环境差,工期要求短。
The problem come forth in the installation process of imbed parts of slab gate at the inlet of hydropower station and its treatment were analyzed.
分析了水电站进水口工作闸门埋件安装过程中遇到的问题及解决方法。
The problem come forth in the installation process of imbed parts of slab gate at the inlet of hydropower station and its treatment were analyzed.
分析了水电站进水口工作闸门埋件安装过程中遇到的问题及解决方法。