• The only connection between the front- and back-end parts is the synthesis-gas process stream, and the HP steam utilized by the compressors.

    前端后端的主要联系在于合成气流程以及压缩机对高压蒸汽使用。

    youdao

  • The paper analyses the leaking reasons for the newly installed valves of the new HP steam drum, and describes the measures to plug the leak under pressure.

    分析高压汽包一批安装阀门泄漏原因详细介绍带压堵漏所采取措施

    youdao

  • The paper presents a method for calculating mass flow distribution and pressure losses in HP, IP and LP steam turbine extractions.

    介绍汽轮机高、中和低压缸抽流道的流量分布计算方法

    youdao

  • This paper presents the manufacturing method for inner chamber of HP main steam control valve for 600MW turbine under current conditions.

    就在现有条件下解决6 0 0MW汽轮机高压调节阀加工难关,实现该部件的内部生产制造方案进行介绍

    youdao

  • This dry steam is further super-heated and then fed to the HP cylinder of the turbine.

    蒸汽进一步过热然后被供给气轮机高压

    youdao

  • The thermal and stress, included steady and transient, were calculated for HP inside cylinder of 125MW cogeneration steam turbine with the help of ANSYS.

    通过ANSYS有限元通用软件对125MW供热汽轮机高压稳态、非稳态温度场应力场进行了计算

    youdao

  • Through analysis, it is considered, that steam leak exists in HP cylinder, and the position of leakage is pointed out.

    汽轮机改造后性能试验中,发现高压抽汽温度过高,通过分析认为缸内存在汽,指出了漏汽的位置

    youdao

  • This paper focuses on the influence of the flange and bolt heating equipment on differential expansion of HP casing in 200mw steam turbine.

    主要探讨200 MW汽轮机组法兰螺栓加热装置高压影响

    youdao

  • To solve the problem of steam surplus in a deaerator, the way of steam exhaust from a steam-driven feedwater pump will be changed from originally to steam heating system to HP heater.

    缓解器内加热蒸汽过剩矛盾,动给水泵汽,排入加热蒸汽系统排至高压加热器

    youdao

  • The thermal field and stress field were calculated for the HP and IP cylinder of 600 MW supercritical steam turbine in one integral star-stop process with the finite element software of ANSYS.

    利用ANSYS有限元软件超临界600MW机组高、中压完整启停过程进行温度应力场计算

    youdao

  • The thermal field and stress field were calculated for the HP and IP cylinder of 600 MW supercritical steam turbine in one integral star-stop process with the finite element software of ANSYS.

    利用ANSYS有限元软件超临界600MW机组高、中压完整启停过程进行温度应力场计算