• As we were leaving, we found that only minutes earlier an elderly woman had fallen over at the entrance and had hit her head on the concrete.

    我们离开的时候,我们发现几分钟老妇人在入口处摔倒了,的头撞到了水泥地上。

    youdao

  • "There is no practicable, feasible, and concrete legal instrument" to regulate Internet use, says Li Xu, deputy head of Tsinghua University's Institute for Internet Behavior.

    没有适用可行并且有形法律手段"互联网使用进行管理清华大学互联网行为研究所副所长李绪(音)表示.

    youdao

  • Three were hit by shotgun pellets, and a female officer was badly hurt when a concrete block struck her on the head.

    其中3散弹枪击中警官混凝土砸到头部重伤

    youdao

  • Right now it's little more than a concrete slab and some wooden beams, but when it's finished, the barn will provide winter shelter for up to six cows and a few head of sheep.

    目前,(这个牲口棚)只不过是一块混凝土一些木头檩子不过建好了这个牲口棚则最多可收容6头牛头羊在里面过冬。

    youdao

  • Simplicity: the program can use these node tests to select a group of elements based on their common group head element or type definition rather than enumerate all concrete element names one by one.

    简单性程序可以使用这些节点测试选择基于共同head元素类型定义元素不是逐一列举所有具体的元素名。

    youdao

  • WebSphere Portal exploits relative URLs by including the pre-serialized base state into the head of the HTML page using the HTML base tag; the concrete relative URL contains the state delta only.

    WebSpherePortal通过预先序列化的状态包含使用html标记html中;具体相对url包含状态增量

    youdao

  • Combining with the concrete situation of Dragon Head mine, the author analyzed the cause of mine fire and expounded on the preventative measures for mine fire.

    作者结合龙首具体情况分析了引起矿山火灾的原因,阐述了矿山火灾预防措施

    youdao

  • If you are looking for a venue that offers more in terms of scenery than just a concrete jungle, then you must head to California.

    如果正在寻找一个欣赏更多风景不仅仅只是高楼林立的地方,那么必须前往加尼福尼亚。

    youdao

  • As the high head, high velocity and large flow of flood discharge, the concrete of spillway tunnel in Xiaowan Hydropower Station is easy to be damaged by cavitation.

    小湾水电站泄洪洞泄洪时具有水头、高流速、泄量特点,混凝土冲刷力强,容易产生空蚀破坏

    youdao

  • Songshan concrete face rockfill dam is the head project of Songshan diversion works for Songjianghe water power station.

    松山混凝土面板堆石坝松江河水电站松山引水枢纽头部工程

    youdao

  • The strength of top pile concrete, especially head part, ensured by taking measurement, Single allowable bearing capacity of this pile is enhanced.

    采取措施保证(尤其是桩头部分)混凝土强度提高容许承载力

    youdao

  • Due to the high water head of the GHS, the design unit put forward a suggestion of using the pre stressed reinforced concrete spiral case.

    高坝洲水电站由于设计水头较高,设计单位建议采用预应力钢筋混凝土蜗壳。

    youdao

  • These results can be referenced to the plan of water level procedures on the dam; and the behaviors of high rockfill dam with asphalt concrete core under high water head are studied.

    研究结果可供大坝蓄水计划参考,水头沥青混凝土心墙运行提供一定的参考。

    youdao

  • In addition, flaps (51) are preferably provided on the recess former to prevent the sides of the attachment head (34) from being encased in the concrete.

    另外挡板(51)优选设置部成形器上,从而避免附连头部(34)侧面埋入混凝土中。

    youdao

  • Building of hydraulic tunnels with high head and large diameter increase gradually, and the underground reinforced concrete branch pipe is adopted in more and more projects.

    相应水头直径水工压力隧洞建设也逐渐增多并且越来越多的工程采用地下钢筋混凝土

    youdao

  • Temperature control measures for side wall concrete construction in the sixth lock head of the permanent navigation locks at the Three Gorges Project during hot season are briefly given in the paper.

    简述三峡工程永久船闸闸首边墙混凝土高温季节施工温控措施

    youdao

  • The limit bearing capacity is obtained by using the refined finite element elastoplastic analysis on the concrete in the anchor head part.

    头部混凝土进行精细有限元弹塑性分析得到极限承载力

    youdao

  • This paper introduces a successful application of the composite foundation with low-strength-concrete pile and cement-mixed pile in Ouhai road of Wenzhou to alleviate bridge-head jump.

    介绍温州瓯海大道桥头路堤采用低强度砼水泥搅拌组合复合地基处理桥头跳车问题。

    youdao

  • The three-dimensional effects of pile head and applicability of plane-section assumption are main problems in low strain dynamic tests on cast-in-situ concrete thin-wall pipe piles.

    浇薄壁管桩应变检测时,存在桩头效应以及平截面假定适应性问题

    youdao

  • The three-dimensional effects of pile head and applicability of plane-section assumption are main problems in low strain dynamic tests on cast-in-situ concrete thin-wall pipe piles.

    浇薄壁管桩应变检测时,存在桩头效应以及平截面假定适应性问题

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定