• We use unilateral normal distribution of upper magnitude limit instead of fixed one and analyze the results of seismic hazard analysis of this change and engineer meaning of it.

    震级上限单边正态分布模型代替固定的震级上限模型,分析这种改进地震危险性分析结果的影响及其工程意义

    youdao

  • In seismic hazard analysis computation, there is much uncertainty in the process of defining latent focal region and upper magnitude limit.

    目前进行地震危险性分析计算中,潜在震源区范围震级上限的确定过程存在很大不确定性。

    youdao

  • This change of upper magnitude limit makes seismic hazard reduced, which is useful for project with one hundred years utilization limit.

    震级上限改进使得地震危险性降低对百使用年限工程具有实用性

    youdao

  • The conflicting problem of flash point and lower explosive limit as a criterion of hazard is studied in this paper.

    文章闪点爆炸下限作为危险性判据相抵触问题进行了探讨。

    youdao

  • Provided such a system is carefully designed to limit moral hazard, it can contribute to public confidence in the system and thus limit contagion from Banks in distress.

    如果存款保险制度设计合理有助于降低道德风险提高公众对银行体系信心,防范有问题银行的风险扩散。

    youdao

  • Provided such a system is carefully designed to limit moral hazard, it can contribute to public confidence in the system and thus limit contagion from Banks in distress.

    如果存款保险制度设计合理有助于降低道德风险提高公众对银行体系信心,防范有问题银行的风险扩散。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定