• The prediction result accuracy of WAM model is influenced significantly by grid resolution.

    网格分辨率对WAM海浪模式预报结果的准确性有重要影响。

    youdao

  • The accuracy of flood area is mostly dependent on the contour interval of map, accuracy of digitizing map, accuracy of DEM, and interval of GRID, detecting resolution of pixels.

    对于采用本方法计算淹没区,准确性受地形图等高距大小、数字化采集精度、数字地面模型(DEM)高程精度以及格网间隔大小、像素探测分辨率等因素的影响。

    youdao

  • The East China sea model has much higher resolution grid, which has simulated seasonal variation of mixture and stratification.

    渤黄东海环流模式的网格具有更高的分辨率,模式很好地模拟黄东海混合与层化的季节演变规律。

    youdao

  • This paper presents a dynamic construction algorithm for the multi-resolution terrain model based on the large scale GRID data or discrete elevation data.

    论述了一种基于大规模格网数据或离散高程点动态构建多分辨率地形模型的算法。

    youdao

  • This trend is the confusion and interchange of the terms "grid" and "resolution" with respect to the physical-design database.

    对于结构设计数据库,混淆和交换术语“栅格”和“分辨率”成为趋势。

    youdao

  • According to the result, grid size affects the accuracy of derived information, especially in the flat areas. We should choose the DEM with right resolution.

    研究表明,DEM的水平分辨率对地形信息的精确性有影响,网格的增大增加了DEM对地形信息的概括,应根据不同的需要选择不同分辨率的DEM。

    youdao

  • Using the so-called approximation of image property by a multi-grid operator, we can derive a method of multi-resolution decomposition of the image, thus the fusion image is formed by reconstructing.

    本文从连续图像出发,将二阶偏微分算子应用于影像函数,利用多重网格算子能得到近似影像的性质,得出一种多分辨影像分解的方法,经过图像重建过程得到融合影像。

    youdao

  • With the model and the gis technology, the high - resolution dimensional grid - layer chart of monthly temperature and precipitation in vietnam is built. 3

    利用该模型和地理信息系统技术,建立了越南各月气温、各月降水量高解析度空间分布栅格图层。

    youdao

  • Based on the continuing interpolation grid of the roof and floor of coal seam, a new resolution to fault is put forward on 3d visualization deposit modeling.

    基于煤层顶、底板的整体插值,实现了对三维可视化矿床模型的断层处理。

    youdao

  • Based on the continuing interpolation grid of the roof and floor of coal seam, a new resolution to fault is put forward on 3d visualization deposit modeling.

    基于煤层顶、底板的整体插值,实现了对三维可视化矿床模型的断层处理。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定