The generator cost increased least after generation rescheduling to meet high stability requirements in New England test power system, which shows effectiveness of the algorithm.
新英格兰测试系统的分析结果表明,在系统总发电成本增加最小的情况下,系统的稳定程度已提高到设定的目标,证明了该算法的有效性。
The generator cost increased least after generation rescheduling to meet high stability requirements in New England test power system, which shows effectiveness of the algorithm.
新英格兰测试系统的分析结果表明,在系统总发电成本增加最小的情况下,系统的稳定程度已提高到设定的目标,证明了该算法的有效性。
应用推荐