Two sets of auto-monitoring system have been built up for Geheyan dam.
清江隔河岩大坝已经建成两套安全监测自动化系统。
The seepage predicted by this method based on the monitoring data for the dam in Geheyan Pr…
本模型应用于隔河岩水电站的坝基渗流量的预测,计算结果与实际监测值吻合良好。
The water turbine model test for Geheyan Project was performed in 1991, in Lachine, Quebee, Canada.
隔河岩水轮机模型试验1991年在加拿大魁北克拉辛市进行。
This paper provides the experimental results on flood release and energy dissipation for Geheyan Project.
本文着重介绍隔河岩枢纽泄洪消能试验研究成果。
This paper describes the result of anchor and shotcrete support of a diversion tunnel of Geheyan Project.
本文叙述了清江隔河岩工程导流隧洞的锚喷支护试验研究成果。
The thrust bearing of Geheyan hydroelectric power station is supported by many small springs, babbitt thrust pads.
隔河岩水电站推力轴承为小弹簧多点支撑结构,钨金瓦面。
The side slope at the exits of the diversion tunnels of Geheyan hydropower station is a man-made high and steep one.
清江隔河岩水利枢纽电站引水洞出口是由自然边坡改造而成的高陡人工边坡,具上硬下软岩体结构。
This method has been used in the stability analysis of the entrance and outlet slope of Qingjiang Geheyan Hydropower st...
该方法在清江隔河岩水电站进出口边坡稳定性分析中获得了较好的结果。
The Maoping landslide is located on the right bank of the Qingjiang River, Geheyan Reservoir Area in Hubei Province of China.
茅坪滑坡是清江隔河岩库区当前变形最严重的大型滑坡,其形成演化研究对于茅坪滑坡发展趋势预测和防治有重要意义。
The seepage predicted by this method based on the monitoring data for the dam in Geheyan Project is in good agreement with the observation data.
本模型应用于隔河岩水电站的坝基渗流量的预测,计算结果与实际监测值吻合良好。
In the paper introduced are the general design, network structure, and the application of Geheyan Dam GPS automation and security monitoring system.
介绍隔河岩大坝外部观测变形gps自动化安全监测系统总控管理软件的总体设计、结构和功能。
The case analysis of safety monitoring data of Geheyan Dam verifies that the above approaches are capable of identifying gross errors outstandingly.
隔河岩大坝安全监测数据的实例分析表明,这些方法具有较强的粗差识别能力。
This method has been used in the stability analysis of the entrance and outlet slope of Qingjiang Geheyan Hydropower Station and achieved good results.
该方法在清江隔河岩水电站进出口边坡稳定性分析中获得了较好的结果。
Comprehensive model test of reinforcement scheme is performed for Geheyan gravity-arch dam on the Qingjiang River using geomechanics modeling technique.
本文采用地质力学模型试验技术对清江隔河岩重力拱坝加固方案进行了整体模型试验。
The structural earthquake resistance characteristics of the ship lifter tower in Geheyan project are studied in model test on a 3 D six freedoms shaking table.
利用先进的大型三向六自由度地震模拟振动台进行了升船机塔柱结构抗震试验研究。
The pyrite which lies in the foundation rock under Geheyan Project can cause an erosive action to the Portland cement grouting material used in the curtain grouting.
隔河岩工程基础岩层中含有黄铁矿,它对帷幕灌浆的水泥浆材有腐蚀作用。
Monitoring observation localization for Geheyan Project in 1998 flood season was the deep outlets, the surface spillway, the still basin and auxiliary energy dissipators.
1998年汛期隔河岩水利枢纽观测部位为深孔、表孔及消能工。
Gaobazhou project is the reverse regulation reservoir of the upstream Geheyan project, and its flood control operation will be carried out in coordination with Geheyan reservoir.
高坝洲水利枢纽是上游隔河岩水利枢纽的反调节水库,洪水调度将与隔河岩水库联合运行。
The diversion tunnel of Geheyan Project on the Qingjiang river is one of successfully excavated large-scale underground cavities in the carbonate rock regions in China at present.
清江隔河岩水利枢纽导流隧洞是我国目前在碳酸盐岩地区开挖大跨度地下洞室的成功工程之一。
This paper describes the in-situ stability monitoring of the chamber of Qingjiang Geheyan Hydrolic Power Station during excavation in shale for treating the weak seam 201 in the high slope.
本文介绍了清江隔河岩电站厂房高边坡201夹层处理时页岩中洞室开挖的稳定性监测。
This paper describes the in-situ stability monitoring of the chamber of Qingjiang Geheyan Hydrolic Power Station during excavation in shale for treating the weak seam 201 in the high slope.
本文介绍了清江隔河岩电站厂房高边坡201夹层处理时页岩中洞室开挖的稳定性监测。
应用推荐