• Illinois was one of the states keen to win FutureGen.

    伊利诺伊是最有希望赢得“未来发电”的州之一。

    youdao

  • The DOE would oversee FutureGen and pay 74% of the costs;

    国家能源部监督这项“未来发电”计划并支付74%的成本;

    youdao

  • We're certainly going to review the FutureGen project, and there are other technologies that we have to start looking at.

    我们肯定会调整“未来发电”项目,也已经开始考虑其它的技术。

    youdao

  • FutureGen was scheduled for 2012, but has now been scrapped in favour of several smaller projects that have yet to be selected.

    “未来发电”项目本来预定2012年完工,现在则被搁置了起来。这一项目被几个有待选择的较小的项目建设取代。

    youdao

  • The hydrogen produced in a fully integrated, combined-cycle plant like FutureGen promises to be 25% cheaper than today’s hydrogen.

    设计完整、循环完全类似“未来发电”的工厂里生产的氢气造价将比用现在的方法降低25%。

    youdao

  • The hydrogen produced in a fully integrated, combined-cycle plant like FutureGen promises to be 25% cheaper than today's hydrogen.

    像FutureGen这种以完全整合的联合循环电厂的制氢气方式会比今天的其他制氢气方式便宜25%。

    youdao

  • Mattoon may or may not be the site of a project. Route 16 through Mattoon has been lined with signs declaring support for FutureGen.

    目前尚未确定马顿是否会成为新电站点,但穿过该城的16号公路上已经沿途竖满了支持“未来发电”的标牌。

    youdao

  • Though it appears to all intents and purposes like a state-of-the-art power station, FutureGen is actually a huge hydrogen production facility in disguise.

    虽然这个工程的目的看起来是创造一个顶尖的能源站,实际上它就是一个大型的氢气制造厂。

    youdao

  • FutureGen would be a near zero-emissions plant that converted coal into hydrogen, to power electric turbines, and carbon dioxide, to be pumped underground.

    “未来发电”计划将实现建设接近零排放的电厂,在这里将煤转化为氢,再转换到涡轮发电并且产生二氧化碳,将二氧化碳封存在地下。

    youdao

  • America's lawmakers went a step further, and agreed to insure the proposed FutureGen plant and to indemnify the firms behind it from all lawsuits arising from leaks.

    美国立法者更进一步,同意为建议的“未来发电”投保,并且同意支付这一计划背后公司可能由于泄露而引发的诉讼承担损失。

    youdao

  • The DOE would oversee FutureGen and pay 74% of the costs; a group of energy companies, called the FutureGen Alliance, would pay for the rest and design, build and manage the project.

    能源部将监管未来发电项目,并出资74%,由一些能源公司组成的未来发电联盟,将负责另外的资金,以及项目的设计、建造和管理。

    youdao

  • The DOE would oversee FutureGen and pay 74% of the costs; a group of energy companies, called the FutureGen Alliance, would pay for the rest and design, build and manage the project.

    能源部将监管未来发电项目,并出资74%,由一些能源公司组成的未来发电联盟,将负责另外的资金,以及项目的设计、建造和管理。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定