Tip: Replacement of fuse: Turn down the fuse cover counterclockwise, remove the fuse(protective tube), after replacing, tighten the fuse cover clockwise only (Fuse model: F15A/250V ).
提示:熔断管的更换:逆时针方向旋下熔断器帽,取出熔断管(保险管),更换后,顺时针方向拧紧熔断器帽即可。熔断管型号:F15A/250V。
Carefully place the fusible piece on top, matching it to the jacket edges. Cover with a damp cloth and fuse in place.
仔细地把粘合衬放在上面,与门襟止口对齐。用一块湿布覆盖并定位粘合。
Pull load cascade fuse increase elasticity auxiliary head and arcing cover to points, and load current.
拉负荷跌落式熔断器增加弹性辅助头及灭弧罩,用以分、合负荷电流。
Cover with a damp cloth and fuse in place.
用一块湿布覆盖并定位粘合。
Cover with a damp cloth and fuse in place.
用一块湿布覆盖并定位粘合。
应用推荐