• Using the finite differential method we calculate the temperature field and frozen depth of pavement proper when the road is freezing by degrees with moisture migration.

    采用有限差分方法,完成了土基冻结逐渐进行且伴随有湿迁移的路面体温度场的计算和冻结深度的确定。

    youdao

  • While meeting the requirement of the minimum depth of the overlaying soil and the frozen depth, the cross-reverse fault pipeline is appropriate to be buried in shallow soil.

    跨逆断层的埋地管线在满足管顶最小覆土深度、土壤冰冻深度以及抗浮要求等前提下,以浅埋为宜。

    youdao

  • While meeting the requirement of the minimum depth of the overlaying soil and the frozen depth, the cross-reverse fault pipeline is appropriate to be buried in shallow soil.

    跨逆断层的埋地管线在满足管顶最小覆土深度、土壤冰冻深度以及抗浮要求等前提下,以浅埋为宜。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定