• Framing a feasible test plan to evaluate the working life reliability of such components within limited test period is urgently required in engineering practice.

    工程迫切需要制定合理可行验证试验方案,在有限的试验周期内验证产品的可靠性是否符合指标要求。

    youdao

  • The house is named House 50 50 —in reference to its half-indoor, half-outdoor design—and is L-shaped in plan, framing a driveway at the property's entrance.

    住宅名为House50 50——参考半室内、半室外的设计——布局呈L形,住宅入口处设置了一个车道

    youdao

  • The house is named House 50 50 —in reference to its half-indoor, half-outdoor design—and is L-shaped in plan, framing a driveway at the property's entrance.

    住宅名为House50 50——参考半室内、半室外的设计——布局呈L形,住宅入口处设置了一个车道

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定