The relationship between in situ stress and stability of dam foundation rock is less considered in dam construction.
地应力与坝基岩体稳定的关系是坝工建设中研究得较少的一个课题。
By using the sonic wave and the seismic wave, the foundation rock holding layer on-spot testing of TGP has been performed.
应用声波及地震波对三峡工程坝基建基岩体持力层进行现场检测。
The engineering mechanics properties of soft foundation rock under the second Changjiang bridge in Nanjing are represented.
阐述了南京长江第二大桥桥基软岩的工程力学性质。
Deformation modulus for dam foundation rock must be determined reasonably when stress in dam is analyzed with arch and cantilever trial load method.
在拱梁分载法坝体应力分析时,需要合理确定坝基岩体的变形模量值。
The pyrite which lies in the foundation rock under Geheyan Project can cause an erosive action to the Portland cement grouting material used in the curtain grouting.
隔河岩工程基础岩层中含有黄铁矿,它对帷幕灌浆的水泥浆材有腐蚀作用。
Separated from the deposit and scattered on the river side of the foundation rock, and gradually be covered with sand, forming alluvial sand.
自矿床分离而散落于溪旁基础岩石上,逐步被沙土覆盖,形成冲积性砂。
The approach takes into account not only the effect of direction of seismic wave propagation but also the effect of deformation of the foundation rock through which the waves pass.
该法不仅考虑到地震波传播方向,而且还考虑到坝基基岩变形对堤坝动力反应的影响。
The results show that the failure of dam foundation is caused mainly by the extension of dam heel crack and the expansion of shear-yield zone of the foundation rock near the dam toe.
结果表明,坝基的破坏主要表现为坝踵裂缝的延伸和坝趾附近基岩剪切屈服区的扩展。
Taking the engineering rock quality evaluation of a dam foundation rock at the Shuibuya project for example, the application of quality classification of engineering rocks is studied.
结合水布垭水利枢纽大坝建基岩体工程质量评价实例,对岩体工程质量分级的应用进行了研究。
The current code demand to select dam foundation rock by the single factor-weathering zoning of rock mass, the selected standard of the code shows too simple in complicated geological conditions.
现行规范要求按单一因素岩体风化分带来选择建基面,在复杂地质条件下规范的这一选择标准显的过于简单。
Method of prototype study of strain of dam foundation rock and results are presented; Effective modulus of elasticity of foundation rock is obtained by counter-deduction and the stress is calculated.
本文介绍了大坝基岩应变的原型研究方法和结果,同时反演出基岩的有效弹性模量,并计算了应力。
Because the viscous coefficients of the dam and foundation rock are great, the time-dependent deformation caused by the dam self-weight leads to the dam upstream deformation stabilize in a long time;
其原因是坝体和基岩黏滞系数较大,坝体自重引起向上游变位的时效变形需要较长时间才能稳定;
Because the viscous coefficients of the dam and foundation rock are great, the time-dependent deformation caused by the dam self-weight leads to the dam upstream deformation stabilize in a long time;
其原因是坝体和基岩黏滞系数较大,坝体自重引起向上游变位的时效变形需要较长时间才能稳定;
应用推荐