The engineering is made up with head hinge, diversion canal, fore bay, steel penstock, lord factory building, and the tail channel.
工程总体由首部枢纽、引水渠、前池、压力钢管、主副厂房、尾水渠等建筑物组成,采用建坝和新开一段明渠的引水方式。
The grate will be, at intervals, performed according to the settled time or to the automatic control of pressure head between fore and after-grate.
格栅的运行可按设定的时间间隔运行,也可根据格栅前后水位差自动控制。
The grate will be, at intervals, performed according to the settled time or to the automatic control of pressure head between fore and after-grate.
格栅的运行可按设定的时间间隔运行,也可根据格栅前后水位差自动控制。
应用推荐