• On this basis, accomplishes the stage forecast for construction project quality evaluation based on the great nonlinear function approaching capability of the ANN.

    基础上,利用人工神经网络强大的非线性函数逼近能力,实现建筑工程质量水平的评价

    youdao

  • Contact and Organize Class Surveyors for on-site inspection according to different construction stage, follow the Inspection Reports and keep contact with the Surveyors.

    按照生产建造计划的阶段组织联系船级社检验人员到场检验, 并就检验报告进行跟进

    youdao

  • The influence of concrete creep on bridge structure under the construction and operation stage for prestressed concrete continuous rigid frame bridge and cable-stayed bridge is also analyzed.

    本文针对预应力混凝土连续刚构桥斜拉桥分析计算了施工运营阶段,混凝士徐变桥梁结构影响

    youdao

  • The paper elucidates impact of highway building on environment from stage of highway's design and construction, and introduces some appropriate measures for environment protection.

    公路设计施工阶段两方面阐述了公路建设环境影响介绍了一些环境保护方面的相应措施

    youdao

  • Hoped this thesis achievement can generally to provide a set of effective model pattern for be at the second imbark stage Chinese enterprise to carry on the enterprise culture construction.

    希望本文成果能够为广大处于次创业阶段中国企业进行企业文化建设提供行之有效借鉴模式

    youdao

  • Hence, research on limit displacement for every stage of tunnel construction can offer favorable theoretic basis for decision on design and construction of tunnel of the kind.

    施工阶段隧道极限位移研究该种条件下隧道设计施工决策提供有利技术支持。

    youdao

  • Earthquake emergency command technology system is the core for mitigating of earthquake disaster. Now the research and construction of the system in China is at the primary stage.

    地震应急指挥技术系统防震减灾建设核心内容我国研究建设尚处于初级阶段

    youdao

  • For the construction process of twice prestressed continuous beam, the stress analysis and deformation analysis method during construction stage is provided in this paper.

    根据二次预应力连续施工过程提出了施工阶段应力变形分析方法

    youdao

  • Therefore, the cable tension and shape have to be calculated for each construction stage before analyzing its dynamic behaviour.

    因此悬索桥作施工全过程动力特性分析之前必须首先计算状态的缆轴力几何形状

    youdao

  • Considering the present situation of shield tunneling on Beijing metro, the paper describes the construction stage division and the main points of engineering quality control for shield tunneling.

    结合北京市地铁隧道盾构法施工现状施工阶段划分各阶段的质量管理与控制要点进行阐述

    youdao

  • By means of the monitoring and detailed analysis for each construction stage, feedback controlling design is realized and the construction is controlled.

    通过施工阶段监测分析反馈调整指导施工。

    youdao

  • Based on the design and the construction of Fenli Expressway separated stage subgrade, the paper analyzed and discussed its construction characteristics and attentions for reference.

    离高速公路分台式路基设计施工应用实践为基础分析探讨了高速公路分台式路基的设计施工特点注意要点,供设计与施工者参考。

    youdao

  • The scope for this service should be based on concept through to construction drawing stage, with bi-lingual documentation.

    此项服务范畴应该基于概念而且贯穿整个建筑图纸绘制阶段,文件要求双语。

    youdao

  • The light wooden construction gives space and allows for dynamic stage lighting.

    木质结构生成开阔的空间同时提供灵活舞台照明。

    youdao

  • For cost control in main stage construction, three aspects are expected to be in deep-depth study: the bidding phase, the construction phase, the phase of final acceptance.

    施工阶段造价控制主要三个方面进行深入研究,即招投标阶段、施工阶段、竣工验收阶段;

    youdao

  • During this rational stage, it is very necessary and timely to review the construction for new campus.

    我国高校校区建设理性阶段对于高校新校区规划建设进行适时总结思考十分必要的。

    youdao

  • Briefly describes the property of the construction. control and process for the radial tire technology of single stage building machine for all steel radial truck tire.

    扼要叙述了适用于倍耐力子午胎工艺技术钢丝载重子午胎一次成型机结构、控制工艺方面的特点。

    youdao

  • These probabilistic characteristics provide the basis for the safe reliability analysis of cable stayed buffeting responses during the longest double cantilever construction stage.

    为斜拉桥施工阶段最大悬臂状态安全可靠度分析提供依据

    youdao

  • These analyses not only builded up the role of PR in the stage of brand, but also offered new visual Angle and strategies for brand construction.

    通过这些分析不仅重树了公关品牌时代地位,还给企业品牌塑造提供了新的视角策略

    youdao

  • The segregation of asphalt mixture during the construction is one of the main reasons for the damage in the early stage of the asphalt pavement.

    沥青混合料施工过程中的离析造成沥青路面早期损坏主要原因之一

    youdao

  • Firstly, based on the preliminary evaluation for environment of dangerous source at the prospecting stage, the risk factors effect and construction of risk reduction can be determinated.

    首先据勘察资料对隧道突涌水环境进行初步评价,以确定隧道不同区段降低致险因子影响度施工对策

    youdao

  • Based on analysis for reasons of cement concrete pavement inchoate cracks, it is important to present relevant prevention methods in mixture design and construction stage.

    分析水泥混凝土路面早期裂缝产生原因基础上,提出混合料组成设计阶段现场施工阶段应该采取的措施工程实践具有重要意义

    youdao

  • The TGPs third stage river closure is a key works for the early stage cofferdam supported power generation and guarantee of the successive construction of hydroelectric plant and dam at right bank.

    三峡工程第三截流工程确保实现初期围堰挡水发电同时修建右岸大坝电厂关键性工程。

    youdao

  • It will be used for reference on the construction of dolphinarium and other aquariums which are just at the beginning stage in our country.

    对我国起步海豚其它旅馆建设工作提供借鉴

    youdao

  • Construction work for the two treatment works at Tai Po and Ngau Tam Mei and for the Sham Tseng treatment works Stage II was in progress.

    位于大埔尾的座滤水厂,以及深井滤水厂第二建筑工程正在进行。

    youdao

  • But in modern times, people with the most sincere heart, love for the construction of a dance a new stage.

    现代人们更是真挚关爱的舞蹈建设一个新的舞台

    youdao

  • However, there are many unsolved problems in theory and actual construction for the non-stage face deck over 200 meters in inclined long. The main work of this paper is launching for these problems.

    然而一次性浇筑施工斜超过200面板,理论依据实际施工中都存在许多问题尚未得到解答论文的主要工作就是针对这些问题而展开的。

    youdao

  • The aggregate production systems at the Three Gorges project, should meet requirements for the concrete placement of stage -I works, with a huge volume and a long construction duration.

    三峡工程第二阶段混凝土浇筑量持续时间,混凝土骨料生产供应必须满足混凝土浇筑要求

    youdao

  • As for the control engineering construction cost, the bidding and contract of construction project is a very important stage.

    对于控制工程造价来讲,建设招投标签订合同阶段非常重要一个阶段。

    youdao

  • As for the control engineering construction cost, the bidding and contract of construction project is a very important stage.

    对于控制工程造价来讲,建设招投标签订合同阶段非常重要一个阶段。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定