The sootblower system shall operate with superheated steam. The steam shall be taken from the superheater outlet piping down-stream of the Purchaser's flow element.
吹灰器系统应与过热蒸汽配合工作。该蒸汽来自买方流量计的过热器出口下游管道。
Through industrial testing of tube panel of superheater, the flushing flow velocity was determined, with difficult problems of superheater claming of operating boiler solved.
经过热器管排的工业试验,确定了清洗冲通流速,解决了运行炉过热器清洗的技术难题。
A detailed numerical simulation study was conducted of the flow distribution in the heating surface tubes of a boiler roof superheater featuring a distribution header with a bent inlet.
对一台锅炉中其分配集箱带弯头入口的顶棚管过热器受热面管流量分配做了较详细的数值模拟研究。
A detailed numerical simulation study was conducted of the flow distribution in the heating surface tubes of a boiler roof superheater featuring a distribution header with a bent inlet.
对一台锅炉中其分配集箱带弯头入口的顶棚管过热器受热面管流量分配做了较详细的数值模拟研究。
应用推荐