• The cover shall be limited to sixty days upon discharge of the insured goods from the seagoing vessel at the final port of discharge.

    被保险货物在卸货港卸离海轮后,保险责任以按到岸价交易,我们一般保水渍险。

    youdao

  • The cover shall BE limited to sixty days upon discharge of the insured goods from the seagoing vessel at the final port of discharge.

    被保险货物在最后卸载港卸离海轮后,保险责任以六十天为限。

    youdao

  • Countries now sell each other not final products like port but intermediate ones such as recording heads for hard drives.

    现在,各国相互出售的并非葡萄酒这样的最终产品,而是硬盘磁头等中间产品。

    youdao

  • On October 31, 1977, a final case was discovered in the port town of Merca.

    1977年10月31日在港口城市马尔卡发现这最后病例。

    youdao

  • Giugiaro submitted yet another design at the end of 1990/early 1991, the Montblanc (pictured above), a final Newton Plus design with a gorgeous black exterior and elliptical IR port.

    Giugiaro于90年末91年初还提交了另外一件设计——万宝龙(Montblanc,如上图所示),它是以NewtownPlus设计的最终版本为基础添加华丽的银灰色外壳以及椭圆的红外接口。

    youdao

  • The Linux Host Type has been chosen, and the Host port name should be entered in the final box.

    LinuxHostType已被选中,随后,主机端口名称也会被输入到最后的那个框内。

    youdao

  • During the six-hour, 46-minute spacewalk, Good and fellow NASA astronaut Garrett Reisman completed the installation of the final two new batteries for the B side of the port 6 solar array.

    经过了6小时46分的太空行走,古德和他的同事NASA航天员迦勒特.瑞斯曼完成了为6号端口太阳能电池组B侧安装最后2个新电池的任务。

    youdao

  • The certificate of quality issued by China Commodity Inspection Bureau at the port of shipment shall be final and binding upon both parties.

    在装运港由中国商检局签发的品质检验证书应作为最后依据,此依据对双方具有约束力。

    youdao

  • The Certificate of Quality and the Certificate of Quantity issued by SGS or CIQ at the Discharge Port shall be final.

    SGS或检验检疫局在卸货港口所发出的质量和数量证书应为最终依据。

    youdao

  • Inspection Certificate at Loading Port is final.

    在装货港的检验证书将作为最终证书。

    youdao

  • Port in Liaoning to promote the smooth implementation of resource integration, the paper also made the final four safeguards.

    为促进辽宁港口资源整合的顺利实施,本论文最后还提出了四项保障措施。

    youdao

  • Inspection certificates issued by CIQ at the discharging port shall be deemed as final.

    在卸货港由CIQ颁发的检测证书应为最终结果。

    youdao

  • Vessel master shall give 72/36/24 hours final notice of vessel's ETA at port of unloading to Seller's agent at port of unloading.

    船主将给出72/36/24小时的最终通知,告知卖方在卸货港的代理船舶的预计抵达卸货港的时间。

    youdao

  • Final evaluation results show that the port of listed companies a good overall performance in 2006.

    最后评价结果表明,港口上市公司2006年总体绩效良好。

    youdao

  • Inspection Certificate at Loading Port is final.

    以下简称《免预检验证明书》。

    youdao

  • Inspection Certificate at Loading Port is final.

    以下简称《免预检验证明书》。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定