• The guarantee period will be 24 months after final acceptance.

    验收完成后24个月为保修期。

    youdao

  • Participate in the procedure of final acceptance and final settlement.

    全程参与最终验收和最终决算。

    youdao

  • This procedure shall continue until such time as Customer makes final acceptance of the Web Site.

    这一程序一直持续到客户最终接受网站时为止。

    youdao

  • Have nothing to do with party b. After final acceptance, this batch of products delivery shall be deemed to complete.

    与乙方无关。验收完成后,该批产品的交货即视为完成。

    youdao

  • Developer shall retain a backup of the Web Site files relative to the accepted Web Site for a period of 365 days following final acceptance by the Customer.

    在客户最终接受后365天内,开发方应保留同接受的网站相关的网站文件备份。

    youdao

  • The pre-condition for a final acceptance is an elevator which is installed adjusted and prepared for operation and handover.

    最终检验的前提条件是电梯已经安装、调整、准备运行和交接。

    youdao

  • Particulars and results of the tests made by the manufacturer shall be shown in a statement which has to be a part of the standard for the final acceptance.

    生产厂家所提供的检验结果应在作为最终确认标准的声明中显示出来。

    youdao

  • For cost control in main stage construction, three aspects are expected to be in deep-depth study: the bidding phase, the construction phase, the phase of final acceptance.

    对施工阶段造价控制主要从三个方面进行深入研究,即招投标阶段、施工阶段、竣工验收阶段;

    youdao

  • Starting from analysis on its legal property, the author put forth his opinion centering on the litigable nature of final acceptance and records activity and its relationship.

    作者从分析竣工验收备案的法律性质入手,围绕目前争议较大的有关竣工验收行为的可诉性及与商品房交付的关系等几个方面,提出了自己的见解。

    youdao

  • Based on the Grey system, Grey clustering evaluation model of quality for the software engineering is built in the final acceptance stage of software engineering surveillance.

    本文将灰色聚类评价理论应用于软件工程监理的验收阶段,建立了定量评价软件产品质量的灰色白化权函数聚类模型。

    youdao

  • The warranty period shall be 12 months counting from the date on which the buyer, the end-user and the seller sign the Certificate of Final Acceptance of the Contract Goods.

    保证期自买方,最终用户和卖方签署合同货物最终验收证书之日起十二个月。

    youdao

  • Cover for the benefit of the Principal shall remain in full force and effect under Section 1 in respect of the Insured Property until the date of Final Acceptance of the Project Insured.

    业主方在本保险第一部分项下就被保险财产的受益在保险期间有全部效力,该效力至被保险工程的最后验收时终止。

    youdao

  • Final Acceptance Test" means one or more tests of the System conducted in accordance with Seller's normal procedures at Buyer's Site to demonstrate that the System meets or exceeds the Specification;"

    “最终验收测试”指根据卖方的正常程序于买方场所进行的一次或多次系统性能测试,以证明系统满足或超过规格;

    youdao

  • Final Acceptance Test" means one or more tests of the System conducted in accordance with Seller's normal procedures at Buyer's Site to demonstrate that the System meets or exceeds the Specification;"

    “最终验收测试”指根据卖方的正常程序于买方场所进行的一次或多次系统性能测试,以证明系统满足或超过规格;

    youdao