Testing and study on utilizing this technology for tightened filling in sill stope in Tonglushan Mine are presented in this paper.
本文介绍了铜绿山矿全尾砂高水固化充填试验工艺,以及利用该技术实现底柱采场充填接项的试验研究。
The selection of mining plan, stope blasting and filling technology were described.
介绍了采矿方案的选择、回采爆破和充填的技术与工艺。
The mechanical researches showed that reducing length or increasing width of stope were propitious to improve stability of backfill and to lower filling cost.
高阶段充填体力学研究表明:缩短采场长度和增大采场宽度有利于充填体稳定性和降低充填成本。
Using the present method, the reliable indexes of backfill in stope No. 3 in Anqing copper mine, Anhui province, were calculated, and the feasibility of filling design were evaluated.
用本文方法对安庆铜矿3号高阶段采场充填体进行了可靠性分析,并评价了充填设计的可行性。
Using the present method, the reliable indexes of backfill in stope No. 3 in Anqing copper mine, Anhui province, were calculated, and the feasibility of filling design were evaluated.
用本文方法对安庆铜矿3号高阶段采场充填体进行了可靠性分析,并评价了充填设计的可行性。
应用推荐