• Push the white vent cover onto the silicone vent as shown. Make sure: There is no gap between cover and vent, the slit si open before feeding.

    白色入硅胶导气阀门。请确保导气盖导气阀门之间没有间隙喂养前导气管的切口是翻开的。

    youdao

  • Make sure: There is no gap between cover and vent, the slit si open before feeding.

    确保导气阀门之间没有间隙喂养前导气管的切口是打开的。

    youdao

  • Before feeding water, air vent valves, pressure gauge valve, water level gauge, burner supply valve and steam supply valve should be opened fully. Other valves and checking manhole close.

    上水时,空气压力表水位计通通水阀开足,其他阀门检查门无孔门一律关闭

    youdao

  • Before feeding water, air vent valves, pressure gauge valve, water level gauge, burner supply valve and steam supply valve should be opened fully. Other valves and checking manhole close.

    上水时,空气压力表水位计通通水阀开足,其他阀门检查门无孔门一律关闭

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定