This paper briefly describes the activities of quality management at fabrication site of Pinghu platform, and summarizes the successful experience achieved in the activities of quality management.
阐述了平湖油气田平台建造现场的质量管理工作,并对质量管理工作中取得的成功经验进行了总结。
Site schedule control is an important link of whole project control, and platform fabrication is a critical activity of Pinghu oil and gas field development project.
报告。平湖油气田工程现场进度控制是整个项目控制过程中的一个重要环节,平台建造是整个平湖油气田项目的关键活动之一。
In order to reduce platform fabrication period and achieve early start-up, both pre-drilling and platform drilling methods are adopted in developing Pinghu oil & gas field.
为了缩短平台建设周期,使之早日投产,平湖油气田采用了预钻井和平台钻井相结合的方式。
Because of fabrication by inter-platform, multi-software merging and the complexity of file, some problems appearing in output process needed to be solved.
由于跨平台、多软件融合制作及文件的复杂性,需要解决输出时常出现的一些问题。
This paper reports the development of a novel microelectrode array, based cell sensor recording platform with the fabrication of microelectrode array MEA.
综述了目前国际上基于微电极阵列技术的细胞传感器芯片的研究状况。
With site supervision of ARCO engineers, China Offshore Oil Platform Fabrication Company has made significant improvements in the project.
本文介绍中海石油平台制造公司在海南气体处理厂主体工程管线、管件及设备保温所采用的施工工艺。
With site supervision of ARCO engineers, China Offshore Oil Platform Fabrication Company has made significant improvements in the project.
本文介绍中海石油平台制造公司在海南气体处理厂主体工程管线、管件及设备保温所采用的施工工艺。