If he cannot begin the construction on time, he should propose the extension request to the assignor ahead of 30 days, but the time can't exceed a year utmost.
不能按期开工建设的,应提前30日向出让人提出延建申请,但延建时间最长不得超过一年。
If he cannot begin the construction on time, he should propose the extension request to the assignor ahead of 30 days, but the time can't exceed a year utmost.
不能按期开工建设的,应提前30日向出让人提出延建申请,但延建时间最长不得超过一年。
应用推荐