• The key indicators for evaluating the benefit of explorational activity should include 2-D seismic cost per kilometer, 3-D seismic cost per square kilometer, and drilling cost per meter in depth.

    公里地震成本、每平方公里三地震成本进尺钻井成本评价勘探作业效率关键指标

    youdao

  • The key indicators for evaluating the benefit of explorational activity should include 2-D seismic cost per kilometer, 3-D seismic cost per square kilometer, and drilling cost per meter in depth.

    公里地震成本、每平方公里三地震成本进尺钻井成本评价勘探作业效率关键指标

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定