If an event has been set and the current time is far enough from the last event execute time, a new event is executed.
如果设置了一个事件并且当前时间距离最后一个事件的执行时间足够远,则将执行一个新事件。
Scheduling of heterogeneous system takes aim at balancing computing load and getting minimal parallel execute time.
异构系统上调度的目标是平衡计算负载,以获得最短的并行计算时间。
Scheduling of heterogeneous system takes aim at balancing computing load and getting minimal parallel execute time.
异构系统上调度的目标是平衡计算负载,以获得最短的并行计算时间。
应用推荐