Given that the fund is more likely to inflate its estimation of the illiquid assets, it would seem that investors who withdraw early get the better returns over that time period.
鉴于该基金更希望抬高其预估的非流动性资产,所以就会看到,早些时候撤回的投资人,在那段时间得到了较好的回报。
The detection and parameter estimation of DS signal are studied in this paper. Cyclic period chart spectrum estimation is used on parameter estimation.
本文研究了直扩信号的检测和参数估计两方面内容,参数估计使用了循环周期图谱估计方法。
Finally, it makes the asymmetric estimation with high-frequency data in a specific period, using the method of realized volatility and the line model.
最后,在一个具体的时间段采用高频数据对不对称性作出估计,我们应用已实现波动率的方法并用线形模型做出了估计。
However, the lower bound of the precession period provided may be far less than the true precession period, which will seriously degrade the estimation performance.
进动周期下限可能远小于真实进动周期,此时自相关法的估计性能将严重下降。
Cyclic period chat spectrum estimation is used on parameters estimation such as carrier frequency, chip width and amplitude.
参数估计主要对直扩信号的载频、码片时宽和幅度进行了估计。
It can be seen that the frequency curve calculation is basically reasonable and show the estimation of "1482 flood" return period is rational after putting palaeofloods into flood series.
把古洪水加入到洪水系列后进行频率计算,可以看出频率曲线基本合理,说明对1482年洪水重现期的判断是合理的。
Simulation results and theoretical analysis show that the new period calculation method in this paper is robust? computationally simple and its accuracy of estimation is satisfactory.
理论分析和仿真结果表明,新算法具有较强的鲁棒性,其抗噪声及抗协波失真性能明显高于现有周期算法,且计算简单,精度令人满意。
Conclusion The time regularity of expression of VEGF in brain injury may provide an information for estimation of injury time and survival period after brain injury.
结论VEGF在弥漫性脑损伤中表达的时序性变化规律可望为脑损伤形成时间及伤后存活时间提供参考。
The model is based on different semantic relationships, and is estimated according to maximum likelihood estimation. Semantic distance is used to estimate semantic relationships in estimating period.
该模型定义在不同语义关系之上,基于极大似然估计法利用语义距离来对语义关系进行参数估计。
To resolve the problem of time-delay estimation for sub-sampling sinusoidal signals, a new method composed of multi-period sampling and multi-layer correlation is proposed.
针对正弦信号时差估计的多解模糊问题,提出采用多周期取点欠采样和多重相关方法来解决。
According the actual data of 12501 earth's surface observation station, the law and estimation of subside velocity of various points in active period are discussed emphatically during driving stope.
通过12501地表观测站实测资料,着重讨论工作面推进过程中活跃期主断面内各点的下沉速度规律和预计方法。
We should do well the cost estimation of highway project, because of long construction period, changing situation, many types of materials and equipment, large differences in geological conditions.
公路项目工程由于工期长,情况变化大,材料设备类型多,地质条件差别大,因此应做好成本测算。
We should do well the cost estimation of highway project, because of long construction period, changing situation, many types of materials and equipment, large differences in geological conditions.
公路项目工程由于工期长,情况变化大,材料设备类型多,地质条件差别大,因此应做好成本测算。
应用推荐