The penstock construction in Ertan Hydropower Station is undertaken by the German NOELL Company.
二滩水电站压力钢管工程由德国NOELL公司承建。
We can exactly evaluate the Feixianguan Ertan high resistivity reservoir by analyzing the factors.
综合分析各种因素,才能准确评价川东北飞仙关鲕滩高电阻率储层。
The improved instrument was of good effect for using in the Ertan power station's curtain grouting.
经改进后的仪器在二滩水利工程帷幕灌浆施工中投入使用,获得了良好的应用效果。
According to rock association and sedimentary formation, strata in Ertan Hydropower Station dam area may be divided into 3 Members.
二滩水电站库区的地层岩性,按其组合和沉积建造分为三段。
The cooling water plastic pipes have been widely used in concrete DAMS abroad, but only on the Ertan hydroelectric project in China.
将塑料水管作为大坝混凝土的冷却水管在国外已得到较广泛的使用,而国内仅在二滩水利枢纽中普遍使用。
The faunal composition, characteristics, evolution and development of the Fishes in Ertan Reservois and nearby river area are discussed.
论述了二滩库区及相邻江段的鱼类区系组成及其特点。
The acceleration process caused by Yuanyuan M5.8 Earthquake at the top of Ertan Reservoir Dam and its Fourier frequency spectra are analyzed.
介绍了盐源5 8级地震二滩大坝顶部的加速度时程及傅氏谱。
This paper introduces briefly the operation, function and the structure of strategy table of stability control equipment in Ertan hydropower plant.
简要介绍了二滩电厂安稳装置的作用、功能和安控系统策略表的结构。
Taking Ertan Arch Dam as a study case, the optimal layout of sensors for high arch dam is studied herein based on QR decomposition and MAC criterion.
本文以二滩拱坝为例,研究了基于QR分解和MAC准则(模态置信度准则)的高拱坝传感器优化布置方法。
There are many difficulties for judging reservoir and fluid properties because of the Feixianguan Ertan high resistivity zones in the north-east Sichuan.
川东北飞仙关鲕滩储层普遍存在高电阻率现象,给储层识别和流体性质判别带来了很大的困难。
As the diversion tunnel of Ertan Hydroelectric plant has big dimensions and high initial ground stress, the new conception and method are used in design.
二滩水电站导流隧洞规模大、初始地应力高,设计中采用了现代地下结构设计理论和方法。
In this paper, the material, structural properties and the site fabricating technology of stainless steel split runner for Ertan power plant were introduced.
本文介绍了二滩水电站不锈钢分瓣转轮的材料、构性能和现场组焊工艺技术。
The runners of 6 operated generating unit of Ertan Hydro Station have been checked and no crack on the primary weld of the field welding position is observed.
二滩水电站已全部投运的6台机转轮经停机检查,现场焊接的主焊缝无裂纹。
The gain value of the PSS for the generating unit of Ertan Hydro Station is adjusted on the basis of the field test, which has achieved good damping effectiveness.
二滩机组PSS增益设定是根据现场试验进行调整,取得了较好的阻尼效果。
It is proved that the international contract of civil engineering construction for Ertan Hydropower Station is a good model since it has practiced for about 7 years.
二滩水电站土建工程国际合同文本实施已近7年,实践证明它是较好的合同样本。
This paper introduces the general structure, operation principle and application effect of the dual microcomputer regulator of the governor of Ertan Hydropower Station.
介绍了二滩水电站调速器的总体结构、微机调节器的工作原理和应用效果。
On the basis of the features of Ertan reservoir in Feixianguan TM, the paper researches the optimum seeking method of temporary plugging agent by using core flow experiment.
用岩心流动实验的方法,针对飞仙关鲕滩储层,从暂堵剂的堵塞性及酸化解堵性方面对暂堵剂优选进行了研究。
Based on the optimized allocation of the sensors, the prototype dynamic test and parameter identification under flood discharge excitation for Ertan Arch Dam are carried out.
基于该传感器优化配置结果,开展了二滩拱坝泄洪振动原型动力测试和模态参数识别。
The two-dimensional nonlinear FEM results for Ertan project were introduced in this paper, which were analysed on the section 0+679m of the diversion tunnel on the right bank.
本文介绍了二滩水电站工程导流隧洞右岸0+679剖面二维非线性有限元分析结果。
For high in situ stress occurred in Ertan dam area, combined action of initial in situ stress field, time and space effect during excavation and external loads arch thrust etc.
笔者针对二滩电站坝区存在的高地应力现象,从初始地应力场的建立、施工开挖的时空效应,直到与拱推力等外荷载共同作用下对坝基岩体稳定的影响全过程进行了分析和计算。
The total installed capacity of Xiluodu hydropower station amounts to 12600MW that is 4 times of Ertan station, and its comprehensive technical difficulty is on top of the world.
溪洛渡电站装机1260万千瓦,相当于4个二滩电站,其工程综合技术难度位居世界前列。
This paper gives some reasonable suggestions on head cover drainage design according to the experience of treatment and reformation for head cover drainage of Ertan Hydropower Plant.
在总结二滩电厂顶盖排水故障的处理过程和成功改造实例的基础上,对类似机组的顶盖排水设计进行了初步的探讨。
In the initial operation of Ertan Hydropower Station, its oil, water and compression air systems occur many problems so that the new product and technology are applied to improve them.
二滩水电站投运初期,油、水、风系统先后出现了许多问题,通过应用新产品和新技术对其进行了改造。
Ertan arch dam is the typical module of high hyperbolic arch dam, whose design method and technique has been widely used in the construction of large-scale hydraulic power plants recently.
二滩拱坝是双曲高拱坝的典型代表,近年来其设计理念、方法被广泛用于国内大型水电枢纽的建设。
The influences of Ertan Hydroelectric project under construction, post completion and the water levels' rise and fall in the reservoir on terrestrial vertebrate and the measures are analyzed.
分析了二滩水电站在施工期、竣工蓄水后、水库水位消涨对陆生脊椎动物的影响及应采取的对策。
The horizontal construction joint treatment of Ertan Arch dam concrete, concrete placement of dam base and connection efficiency examination between concrete joints and concrete with dam base.
介绍了二滩拱坝混凝土水平施工缝处理及坝基面混凝土浇筑和检查混凝土缝间、混凝土与坝基结合的效果。
The international purchase amount of mechanical and electrical equipment of Ertan Hydro Station is up to about 200 million US dollars. The purchase items are numerous and bring great competition.
二滩水电站机电设备国际采购总金额近2亿美元,其项目众多,竞争激烈,采购方式灵活且历时较长。
The international purchase amount of mechanical and electrical equipment of Ertan Hydro Station is up to about 200 million US dollars. The purchase items are numerous and bring great competition.
二滩水电站机电设备国际采购总金额近2亿美元,其项目众多,竞争激烈,采购方式灵活且历时较长。
应用推荐