The problem of claim for the loss caused by productivity descending in engineering project claims is discussed.
讨论了在工程项目索赔中因生产率降低所造成损失的索赔问题。
Many disputes and claims caused by engineering contract occurrence frequently, during the project performance, which has become the first factor of engineering claims.
在建设工程实施过程中,由于合同所引起的纠纷、索赔等问题屡屡发生,成为工程索赔的首要原因。
Many disputes and claims caused by engineering contract occurrence frequently, during the project performance, which has become the first factor of engineering claims.
在建设工程实施过程中,由于合同所引起的纠纷、索赔等问题屡屡发生,成为工程索赔的首要原因。
应用推荐