• The project will begin with a study phase, followed by an Engineering Procurement and Construction (EPC) phase.

    该项目将先从研究阶段开始,接着是工程采购和建设(EPC) 阶段。

    youdao

  • Fishermen's Energy, LLC, the project's developer, selected AECOM to manage the project through the phases of engineering, procurement, construction, commissioning and start-up.

    这一项目的开发商“渔民能源有限责任公司”(Fishermens Energy,LLC)选择艾奕康科技负责从设计、采购、施工、委托到启动的一系列阶段的工作。

    youdao

  • A project execution is usually divided into some elementary phases, such as: engineering, procurement and transportation, and field construction.

    一个工程项目的实施通常可分为几个基本阶段:工程设计、采购和运输、以及现场施工。

    youdao

  • Based on value engineering theory, this paper studies the relationship between value engineering and procurement bidding.

    本文基于价值工程原理,研究了价值工程与采购招标的关系。

    youdao

  • Provide technical support to the functional areas of Procurement, Quality Control, Manufacturing Engineering and Production.

    对采购,质量控制,制造和生产等方面提供技术支持。

    youdao

  • A project execution is usually divided into some elementary phases, such as: engineering, procurement and transportation, and field construction.

    一个工程项目标履行凡是可分为几个根本阶段。

    youdao

  • EPC contractors handle the engineering, procurement and construction of solar power plants.

    EPC承包商负责太阳能电站项目的工程、采购和施工。

    youdao

  • Provide site, and multi-site procurement, support to secure required materials for operations, manufacturing, Engineering, New Product Introduction, Services, and MRO needs.

    提供定点或多点采购,支持运营、制造、工程、新产品导入、服务和MRO需求等所需固定物资采购。

    youdao

  • Project management Consulting: Consulting of engineering project management, project risk management, project procurement management, project cost management, project integration management and so on.

    项目管理咨询:工程项目管理、项目风险管理、项目采购管理、项目成本管理、项目集成管理等方面的咨询。

    youdao

  • The cost of procurement is more than 70%, and some of them about 80% of total cost of international engineering.

    我国参与国际工程项目市场竞争的企业采购占成本的比例在70%以上,甚至者可达80%。

    youdao

  • These include design assistance, manufacturing engineering, prototyping, tool making, maintenance, and even material procurement.

    包括辅助设计、工程制造、原型设计、模具开发、维护,甚至原料采购。

    youdao

  • Purchasing department, procurement department, supplier quality assurance department, engineering department and other interactive department staff and management level.

    采购部门,定单管理部门,供应商质量管理部门,工程部门及其它相关部门人员和管理人员。

    youdao

  • Purchasing department, procurement department, supplier quality assurance department, engineering department and other interactive department staff and management level.

    采购部门,定单管理部门,供应商质量管理部门,工程部门及其它相关部门人员和管理人员。

    youdao