A two stage emergency load shedding algorithm was developed to ensure safe control along with economic operation.
为确保校正控制的安全性同时兼顾经济性,提出一种新的紧急切负荷算法。
The time history of water hammer in pipeline in the condition of unit emergency load dump is calculated by characteristic line method.
在水电站机组丢弃负荷情况下,利用特征线法计算管道内的水击荷载时间历程。
A novel emergency load shedding algorithm is presented to assure security of correct control taking account its economy, which is consisted of two stages.
提出一种新的紧急切负荷算法,以确保校正控制的安全性同时兼顾经济性。
Shoppers can't afford to load up at the supermarket and are going to the most convenient places to buy emergency food items like milk and eggs.
购物者没钱不能在超市买够东西,只能前往最便利的地方购买紧急时备用应急的食物,如牛奶和鸡蛋。
Emergency braking will not only make the running in the brake system is affected, but also increase the chassis and engine impact load.
紧急制动不光会使磨合中的制动体系受到冲击,并且还会加大车辆底盘和发动机的冲击负荷。
Balance weight set free fall emergency braking device, which can realize auto control load loss protection, when the wellhead end accidental loss of load, balance weight free fall.
平衡重设置自由落体紧急制动装置,可实现井口端意外失载后平衡重自由落体坠落不能人控,却能自控失载保护的万无一失。
Load shedding is usually conducted during emergency periods, such as capacity shortages, system instability, or voltage control.
切负荷通常在紧急时期进行,如在容量不足、系统不稳定或电压控制时。
Stand-by power: in a state of emergency, changes in the work load of the emergency power to run. Alternatperformance.
备用功率:在紧急状态时,变动负载工作的情况下应急运行功率。
Electricity power limitation is an important measure to ensure safe operation of the system in the peak load power supply enterprise, or in a state of emergency.
推闸限电非供电企业反在背荷上峰或许者紧迫状况上,保证体解安齐运行的一项从要办法。
In areas of poor power condition, where it's difficult to get an alternative power to supply class 1 load, an emergency power is required.
在供电条件比较差的地区,取得第二个电源供给一级负荷有困难时,也需要增设应急备用电源。
In the first-level load shoulders specially importantly, besides the above two power sources, but must additionally build the emergency power supply.
一级负荷中的特别重要负荷,除上述两个电源外,还必须增设应急电源。
In the first-level load shoulders specially importantly, besides the above two power sources, but must additionally build the emergency power supply.
一级负荷中的特别重要负荷,除上述两个电源外,还必须增设应急电源。
应用推荐