With the help of dynamic programming method, the multistage decision problem on surface water and groundwater is analysed in this paper.
本文借助动态规划理论,分析了地表水与地下水统筹管理的多阶段决策问题。
This part derives the option pricing formula by using the dynamic programming method.
此处运用动态规划方法推出期权定价公式。
The air defense troops assignments uses dynamic programming method to establish the numeric model.
防空兵群兵力分配,运用动态规划方法建立数学模型。
At present, the main way to solve this problem is dynamic programming method and martingale method.
目前解决这一问题的主要方法是动态规划和鞅方法。
By dynamic programming method, authors put forward a decisive method of mining procedure of large surface mining deposits.
本文运用动态规划方法。提出了一种确定特大型水平、近水平露天矿田开采程序的方法。
Secondly, a bidirectional dynamic programming method enforcing ordering and occlusion constraints was used to handle occlusions;
其次,利用加强顺序约束和遮挡约束的双向动态规划方法来处理遮挡;
The optimal combination for these members of standardized design by dynamic programming method is proposed at the end of this paper.
最后,使用动态规划提出了这些标准构件的最优组合。
Based on the traditional dynamic programming method, this paper proposes a local redefined dynamic programming method for power market.
在传统的动态规划法基础上,提出了一种局部加密动态规划算法。
This paper adopts dynamic programming method and greedy method to solve such problems, then analyzes and compares the differences of two algorithms.
采用动态规划法和贪心法对该问题进行求解,分析和比较这两种算法在求解同一问题时的差异。
In this paper an improved dynamic programming method to determine unit commitment is proposed. This proposed method is also named interpolated dynamic programming algorithm.
提出了一种确定机组组合的改进动态规划方法,称为插值动态规划算法。
Global chaining algorithm recovers disconnected fragments of whole objects using dynamic programming method, and obtains good performance in curvilinear detection from strong noise.
线段全局链算法利用动态规划方法来恢复全局物体中的不连续片断,在强噪声中的曲线检测方面获得了较好的效果。
The initial segment is determined by detecting the distance changes of the critical feature parameter vector. With the dynamic programming method, the segmental accuracy is improved.
该算法通过检测临界带特征矢量参数的距离变化确定初始分段边界,结合动态规划方法提高分段的准确性。
According to the HNPC model, the characteristics of construction process are explained. The fuzzy dynamic programming method is introduced into the process control and the realization is presented.
根据HNPC模型的特点,阐明了建筑施工进度计划的特征,把模糊动态规划方法引入到建筑施工进度计划调整中,并给出了具体实现方法。
According to the HNPC model, the characteristics of construction process are explained. The fuzzy dynamic programming method is introduced into the process control and the realization is presented.
根据HNPC模型的特点,阐明了建筑施工进度计划的特征,把模糊动态规划方法引入到建筑施工进度计划调整中,并给出了具体实现方法。
应用推荐