The priest looked at them and saw a pile of jackets, gloves, and scarves in the yellow, dry tumbleweeds that grew in the graveyard.
牧师看了看他们,他看见墓地枯黄的风滚草上堆放着夹克、手套和围巾。
Through research, the problem was solved by adopting gravel pile method and setting reasonable dry beach length in front of the retaining dam.
通过设计研究采用碎石振冲桩法及在子坝前设置合理的干滩长度得以解决这些问题。
Zhejiang Province and describes the overall design and the key technical design such as dry dock, pile foundation, element joints and final joint, etc.
阐述了沉管隧道的总体设计方案,以及干坞工程、管段桩基础、管段接头、最终接头等关键技术方案设计;
This technical study was made on treating vibrating liquefied foundation by dry crushed stone pile based on the project of Shengyang-Qinghuangdao Passenger Dedicated Railway Line.
结合秦沈客运专线工程实际进行了干振碎石桩处理震动液化地基技术研究。
In construction of a railway's soft subgrade, the technique of dry vibration gravel pile was used to consolidate the soft subgrade and a good result was obtained.
某铁路软土路基施工中,利用干振碎石桩施工技术加固软土路基,取得了较好效果。
The valve should be stored in dry room, not allow to store or pile in open air.
该阀应存放在干燥的室内,不允许露天存放或堆置。
From the analysis of the engineering peculiarity of the salty soil, the working principle of the method of the complex foundation of dry jet mixing pile combined with geogrid is studied.
从分析盐渍土的工程特性入手,探讨桩-网复合基础处理盐渍土地基方法及其作用机理。
Dry jet mixed pile composite foundation was used to fasten the soft soil in Wuhan area about ten years ago. But the buildings have had the problems of tilting and sinking since its completion.
武汉地区早些年多采用喷粉桩复合地基加固软土,在其交付使用后陆续出现倾斜、裂缝等问题。
So I brought together all the dry wood I could get at hand, and making a good handsome pile, I set it on fire upon the Hill.
于是,我把附近的干柴通通收集起来,在山上堆成一大堆点起了火。
The article introduces the design, construction, quality control and effect in the application of dry jet mixing pile to the reinforcement of soft clay ground in a project.
文章结合工程实例,论述了水泥粉喷桩在处理软土地基中设计、施工、质量控制以及成桩后的加固效果。
Long spiral dry pore-forming pumping concrete grouting pile can be used in multi-story buildings and low huge buildings.
长螺旋干成孔压灌混凝土桩适合于多层及小高层基础工程。
Method】stored in a dry storage location, do not pile up in the damp, cold places, to avoid rust or oxidation products.
【储存方法】存放于干燥的位置,不要堆放于潮湿,阴冷的地方,避免产品生锈或氧化。
A new pile-driven technology named air curtain dry soil withdrawal can reduce resistance of a sinking pipe by withdrawing soil from the pipe and installing air curtain on the outside of pipe.
空气幕、套管内干取土沉管灌注桩这种新的施工工艺是通过套管内取土,套管外设空气幕来减少沉管阻力。
The lime dry jet mixing pile composite foundation has already been used for a long time at home and abroad, but not widely, and there are still some problems need further research and discussion.
石灰粉喷桩复合地基在国内外早已有之,但应用尚不够广泛,亦还有一些问题需进一步研究和探讨。
They raised their pile of dry brush and damp weeds higher and higher, and when they saw the thick cloud begin to roll up and smother the tree, they broke out in a storm of joy clamors.
他们把干柴湿草堆得越来越高;一见那浓烟袅袅而起把那棵树笼罩起来,他们就喜悦欢呼,像一阵狂风暴雨似的。
Numerical emulation experimentations are carried out on the bearing performances of the single dry-cement jet mixing pile composite foundation by means of the finite element method (FEM).
采用有限元法对粉喷桩单桩复合地基的承载特性进行数值试验。
Vacuum carpet and remove spots. Dose into water tank and shampoo carpet. Brush carpet pile while still damp. Allow to dry, then thoroughly brush vacuum.
在地毯上吸尘并除渍。将本品注入装满水的水箱后干泡清洁地毯。在地毯未干时用地毯梳梳起纤维。待干后用滚刷式吸尘机彻底吸尘。
Vacuum carpet and remove spots. Dose into water tank and shampoo carpet. Brush carpet pile while still damp. Allow to dry, then thoroughly brush vacuum.
在地毯上吸尘并除渍。将本品注入装满水的水箱后干泡清洁地毯。在地毯未干时用地毯梳梳起纤维。待干后用滚刷式吸尘机彻底吸尘。
应用推荐