Various water stopping structures were used in the construction, thus ensuring satisfactory conditions for dry construction in the dock and obtaining good results.
经采用多种不同的止水结构,保证了坞内干施工的条件,效果良好。
Compared with the method of wet construction, dry construction has an edge over the latter in terms of its transparency in construction, precise engineering and relatively shorter construction period.
重力式沉箱码头干法施工在实际工程中应用较少,与水下安装预制结构的湿法施工相比,干法施工具有施工过程透明、施工精度高、施工进度快等优点。
Combining an application case, whole-set underwater rubber fenders' renew under low water level, was realized under dry construction condition through chemical anchorage of screws.
结合工程实例,在创造干施工环境下,通过化学锚固螺栓的方法,实现了更换低水位以下成套橡胶护舷。
Combining an application case, whole-set underwater rubber fenders' renew under low water level, was realized under dry construction condition through chemical anchorage of screws.
结合工程实例,在创造干施工环境下,通过化学锚固螺栓的方法,实现了更换低水位以下成套橡胶护舷。