Time is adopted to analyze excess pore water pressure due to driven pile in clay; and a formula is derived.
引入时间参数分析在粘土中沉桩时所引起的超静孔隙水压力,给出了考虑固结效应的超静孔隙水压力的解。
Model tests of large driven pile jacked into sands were conducted to obtain the soil density changes due to the compaction.
通过砂土中的大型沉桩模型试验,得出了桩周土体相对密度的变化规律。
Driven pile is widely used in pile foundation and how to get it's ultimate bearing capacity is one of the problem that should be determined at first.
锤击桩是桩基工程中广泛使用的一种沉桩方法,确定其单桩极限承载力是桩基工程设计中需首要解决的问题之一。
Driven pile is widely used in pile foundation and how to get it's ultimate bearing capacity is one of the problem that should be determined at first.
锤击桩是桩基工程中广泛使用的一种沉桩方法,确定其单桩极限承载力是桩基工程设计中需首要解决的问题之一。
应用推荐