The article introduces the construction technology of center drift method for shallow excavation tunnel in Beijing Metro Line 5, analyses the monitored data for the earths surface.
介绍了北京地铁5号线磁器口车站浅埋暗挖隧道中洞法施工技术,对地表监测数据进行了分析。
So we construct for the background by the Second Shizuishan Mining, tunneling of the coal road and rock drift, carried on research to single tunneling technique of the horizontal tunnel.
本文以石嘴山二矿煤、岩巷的掘进施工为背景,对水平巷道单巷掘进技术进行了研究。
On the process of tunnel excavation in high geo-stress zone, surrounding rocks will have dynamic drift.
高地应力下的隧洞开挖过程中,围岩将产生动态的变化。
Center drift first construction method was adopted in Wushan main tunnel of Fuzhou 961 Civil Air Defence Work, and ground surface deformation was well controlled.
在福州961人防工程乌山主通道工程施工中采用中洞先行的施工方法,地功地控制了地表变形,保证了地表建筑物的正常使用。
With the increasing of mining depth, the roof-floor lithology of the tunnel shows the characteristics as soft rock, normally resulting in the drift floor-heave.
随着矿井采深的增加,巷道顶底板岩层表现出软岩特性,常导致巷道形成严重的底臌。
With the increasing of mining depth, the roof-floor lithology of the tunnel shows the characteristics as soft rock, normally resulting in the drift floor-heave.
随着矿井采深的增加,巷道顶底板岩层表现出软岩特性,常导致巷道形成严重的底臌。