To overcome the difficulty of unstability of orebody and surrounding rock, the test of flat-back cut-and-fill drift mining is carried out.
针对凡口铅锌矿狮岭顶板矿体和围岩极不稳固的牲,进行了机械化上向进路分层充填采矿工艺的试验研究。
The indoor experiment on the filling materials used for downward slicing drift mining with cemented backfill in Gaolong Gold Mine was performed.
对高龙金矿下向分层进路胶结充填采矿法所用的充填材料进行了室内试验研究。
Concept drift, as a difficult point in the field of data stream mining, is generated with the accompany of time-varying data streams.
概念漂移是数据流分类挖掘中的一个难点,它是伴随着数据流的时变性而产生的。
The upward drift stoping with backfill is a mining method with a widespread use future.
上向进路充填采矿法是一种具有广阔应用前景的采矿方法。
The practice of bolt support in reserved coal drift in mining pressure area is introduced, helpful conclusion is obtained through observation and analyse.
介绍了煤巷锚杆支护在动压区留巷的实践,并通过观测及数据分析,得出了有借鉴意义的结论。
Upwards drift hydraulic fill mining is one of the main mining methods used in Wushan Copper Mine.
上向进路水砂充填采矿法是武山铜矿主要的采矿方法之一。
Coal mining in remote mountainous district mainly on drift of coalpit, and its influence on surface deformation has already been attention.
偏远山区矿山开采多以小窑掘进为主,其对地表变形的影响已引起人们的重视。
When long wall mining to the dip in fully-mechanized coal winning working face is inclined area, we may can't use existing drift draw off water.
当倾斜长壁开采的综放工作面初采范围处于向斜构造区,造成初采放水无法利用已有巷道形成自流放水,必须考虑动力排水或其他的放水方式。
So we construct for the background by the Second Shizuishan Mining, tunneling of the coal road and rock drift, carried on research to single tunneling technique of the horizontal tunnel.
本文以石嘴山二矿煤、岩巷的掘进施工为背景,对水平巷道单巷掘进技术进行了研究。
The feasibility of the protective coal pillar mining in the artificial inclined steep drift in the thick (ultra thick) coal seam of a large slope is discussed.
论证了急倾斜厚(特厚)煤层伪斜上山保护煤柱回收的可行性。
With the increasing of mining depth, the roof-floor lithology of the tunnel shows the characteristics as soft rock, normally resulting in the drift floor-heave.
随着矿井采深的增加,巷道顶底板岩层表现出软岩特性,常导致巷道形成严重的底臌。
Then, it is to remain some blasted ore to block the drift outlet at the last mining level to prevent the impact of air flows induced by the rock falling.
保持最下一层空场出矿分段的进路端部出矿口不敞空,防止冒落冲击危害。
Then, it is to remain some blasted ore to block the drift outlet at the last mining level to prevent the impact of air flows induced by the rock falling.
保持最下一层空场出矿分段的进路端部出矿口不敞空,防止冒落冲击危害。