• The guide wall of oxidation ditch can improve the distribution of flow velocity on downstream section and reduce resistance at bend.

    氧化沟弯道处设置导流墙以改善水流流态,提高氧化沟的运行效果。

    youdao

  • Concrete buttress DAMS when subjected to severe shaking have developed horizontal cracks at the elevation high in the DAMS where the downstream buttresses intersect the vertical "chimney" section.

    混凝土伏扶壁大坝受到强震时,容易在大坝高处形成裂缝,在那里下游坝面扶壁横贯垂直的“烟筒”部分。

    youdao

  • Collapse treatment in section of Hongye-2 Hydroelectric Power Station headrace tunnel downstream of adit No.

    红叶二级水电站引水隧洞2号支洞下游塌方段处理。

    youdao

  • The left training wall of TGP is situated downstream of the transition dam section between spillway and left intake dam.

    左导墙位于泄洪坝段与左厂房坝段之间的导墙坝段下游。

    youdao

  • An experimental investigation is presented concerning the re-intension process of a detonation wave occurring downstream of the acoustic absorbing walled section in this paper.

    实验研究了爆轰波在声学吸收段下游发生的再恢复过程。

    youdao

  • The majority channel downstream Xiaolangdi is wide and shallow wandering section, forming distinctive channel wetlands of the river.

    黄河属于高含沙河流,自小浪底以下河道大部分为宽浅游荡型河道,形成了特有的黄河河道湿地。

    youdao

  • An activity metering unit (9) is operable to determine a level of radioactivity in a metering section (8) of the fluid delivery path downstream from the valve means (V1).

    放射性测量装置(9)可操作以确定所述阀装置(V 1)下游的所述流体输送管道的测量部分(8)的放射性级别。

    youdao

  • This paper presents the construction method of reef blasting of Contract Section C1 in Downstream Regulation Engineering of Xijiang River, which may serve as a reference for similar projects.

    介绍西江下游航道整治C1合同段蟠龙石炸礁工程施工方法,可为类似工程提供借鉴。

    youdao

  • The observation data of the Sanmenxia Project are used to further analyze the relationship between the project's operation modes and fluvial processes of downstream river section.

    结果表明,在黄河上修建大型水利枢纽工程对减轻黄河下游河道淤积,遏制河床抬升具有明显作用。

    youdao

  • The observation data of the Sanmenxia Project are used to further analyze the relationship between the project's operation modes and fluvial processes of downstream river section.

    结果表明,在黄河上修建大型水利枢纽工程对减轻黄河下游河道淤积,遏制河床抬升具有明显作用。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定