• Compensates downstream pressure droop under flow conditions.

    水流条件下补偿下游压力衰减。

    youdao

  • Compensates for downstream pressure droop under flow conditions.

    补偿流量条件下的下游压力衰减。

    youdao

  • The permeation rate and separation factor decrease while increasing downstream pressure.

    二次侧压增大,渗透通量和分离因子减小。

    youdao

  • To control foundation seepage and exit gradient, a plastic concrete cut-off wall, a grout curtain, and a set of downstream pressure relief Wells are incorporated in the design.

    为了控制基础渗流和出逸坡降,设计采用了塑性混凝土防渗墙、帷幕灌浆以及在下游增设一套减压井相结合的方案。

    youdao

  • To control foundation seepage and exit gradient, a plastic concrete cut-off wall, a grout curtain, and a set of downstream pressure relief Wells are incorporated in the design.

    为了控制基础渗流和出逸坡降,设计采用了塑性混凝土防渗墙、帷幕灌浆以及在下游增设一套减压井相结合的方案。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定