• Due to complicated geology and high dip Angle, hole deviation is easy to take place in Qingxi area of Yu-men oilfield, it is the bottle-neck for improving penetration rate for a long period.

    玉门油田青西区块地质情况复杂、地层倾角大、容易发生斜,长期以来一直提高钻井速度瓶颈

    youdao

  • This paper mainly points at produced bigger deviation problem when apply formulas about the hydraulic calculation of DIP in recent years, and analyses some common formulas about head-loss.

    本文主要针对近年普遍使用球墨铸铁管在套用已有的水力计算公式进行计算产生偏差较大问题常用的几个水头损失计算公式进行了一些分析

    youdao

  • Because of the big stratigraphic dip in the well Dong 9, it is hard to keep the well bore quality by means of conventional deviation control measures.

    9由于地层倾角常规措施难以保证质量

    youdao

  • Because of the big stratigraphic dip in the well Dong 9, it is hard to keep the well bore quality by means of conventional deviation control measures.

    9由于地层倾角常规措施难以保证质量

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定