• The construction methods and technical measures of the artificial digging pile are discussed under disadvantageous geologic condition.

    论述人工挖孔桩在不利地质条件下的施工方法和技术措施。

    youdao

  • In this paper, a new idea of increasing the load - bearing capacity of single pile is presented for non -rock -inlaid manual digging pile.

    对于非嵌岩人工挖孔灌注桩,本文提出根据土质条件多节扩头,即沿桩身设置若干个嵌坎的设想,对于提高单桩承载力,具有显著的技术经济效果。

    youdao

  • The manual hole digging pile was adopted in foundation of some building. Granite residual clay was chosen as the bearing stratum of pile tip.

    某建筑物基础采用人工挖孔桩,桩端持力层为花岗岩残积粘性土,经检测发现桩身完整而承载力远低于设计要求。

    youdao

  • The paper proposed compute formula of digging pile panelling vertical cross section, introduced construction method and analysed economic benefit.

    提出了挖孔桩护壁竖向截面积的计算公式,介绍了施工方法,分析了经济效益。

    youdao

  • The applications of large diameter manual hole digging pile in different engineering geological conditions are discussed based upon design examples.

    通过设计实例,从理论上探讨了大直径人工挖孔桩在建筑基础设计中的应用。

    youdao

  • The manual digging pile is an economical and practical type of pile with the properties of high bearing capacity, great flexibility, low noise and no vibration of construction, etc.

    人工挖孔灌注桩是一种经济实用的桩型,具有承载力高、灵活性大、施工噪音小、无振动等特点。

    youdao

  • I read that quote and immediately started digging into the closest pile looking for a card I had just scribbled about an hour earlier.

    当我读刚才那句话时,我就立即去那堆卡片中寻找一张我一个小时之前的记录。

    youdao

  • Not only is the pile-on digging activity possible on the site, it is actually enhanced and made easier by the very design of it!

    网站的设计让这种跟风的投票方式不仅是变得可能,事实上变得越来越容易。

    youdao

  • In this paper some measures for controlling running sand during artificial digging hole pile construction was introduced, they can be used as reference to engineering construction.

    本文介绍了人工挖孔桩中几种克服流砂现象的措施,可供工程施工中参考借鉴。

    youdao

  • Based on the engineering practice, this paper introduced constructional technique and quality assurance measures of big bore hole digging and pouring with expansion pile head.

    通过工程实例,介绍大孔径扩大桩头人工挖孔灌注桩的施工方法及质量保证措施。

    youdao

  • This paper discusses some cautions at manual hole-digging and pile-pouring Designing and construction, puts forward some resolvents thereto.

    本文就人工挖孔灌注桩设计与施工经常遇到的问题进行论述,并提出了解决的办法。

    youdao

  • The paper illustrates the calculation of the amount of work in man-operated well digging and pile depositing with the bottom enlarged in diameter.

    通过实例介绍人工挖孔大直径扩底灌注桩工程量的计算方法。

    youdao

  • Compared to artificial digging-hole pile, the pumping reverse-circulation under-reamed bored pile has higher adaptability to geological condition, and its construction is safety and reliability.

    泵吸反循环钻孔扩底灌注桩与人工挖孔灌注桩相比,地质条件的适应性强,施工安全可靠。

    youdao

  • Compared to artificial digging-hole pile, the pumping reverse-circulation under-reamed bored pile has higher adaptability to geological condition, and its construction is safety and reliability.

    泵吸反循环钻孔扩底灌注桩与人工挖孔灌注桩相比,地质条件的适应性强,施工安全可靠。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定