Guido van Rossum: In 1986 I moved to a different project at CWI, the Amoeba project.
Guidovan Rossum: 1986年,我转向了CWI的另一个叫Amoeba(阿米巴虫)的项目。
The four phases in a RUP project represent different project styles in the software engineering process.
RUP项目的四个阶段体现了软件工程过程中的不同项目样式。
Important: You must ensure that a different project name but the same location is used (see Figure 13 and Figure 14).
重点:您必须确保不同的项目名但是使用相同的位置(见于图13和图14)。
When project tasks thin out, the resource manager ensures that the employee can work on a different project part time.
当项目任务很少时,资源经理会确保雇员临时为不同的项目工作。
In the meantime, we tried this approach with another customer in a different project, and it works there pretty well too.
与此同时,我们在另一个客户的不同项目中也尝试了该方法,并且结果证明同样非常有效。
I have moved to a different project in the portfolio and I wanted to change up the style a little.
在作品集中我已经转移到一个不同的项目中,这个项目中我想稍微改变一下风格。
In this case, the field is not used by teams that work in different project collections for cross-project reporting.
在此情况下,处理不同专案集合的小组不会使用此栏位进行跨专案报告。
No doubt your own modeling exercises will bring in different project compositions, cost structures, team sizes, and so forth.
很可能您自己的建模应用将带来不同的项目构成、成本结构、团队规模等等。
Link to the templates from a different project so the code is generated in that different project instead of the original one.
从其他项目链接到模板,这样就可以在其他项目中生成代码,而不是在原始项目中生成代码。
For public works, the perspective of the Owner's Payment Bonding System may be varied due to different project organization models.
另外,业主支付担保在公共工程中未来的发展前景则需要结合具体的公共工程建设组织模式来确定。
In view of existing cost risk factor and according to utility theory, the paper form the risk degree standard for different project stages.
针对造价风险因素,根据效用理论建立各阶段的风险度评价标准。
The JAR file for YUI Compressor is self-contained, so you can copy the file into a different project and execute it by typing the following command
YUICompressor的JAR文件是自带的,您可以将该文件复制到别的项目,通过输入以下命令来执行
Some effective technologies or methods for managerial decision are proposed according to different project management process and project levels.
针对不同的项目管理过程以及相应的项目层次,提出了有效的管理决策技术或方法。
Creating dependencies between projects makes it easier for different project managers to see how work by other project managers affects their schedules.
在项目之间建立相关性便于不同的项目经理查看其他项目经理的工作对自己的日程有什么影响。
In the choice of electrical equipment, based on economic, reliability, and other indicators, the different project carries out scientific analysis and comparison.
在电气设备选择方案选择中,主要依据经济性、可靠性等指标,对不同方案进行了科学分析与比较。
The method is combined with the practice closely and with high precision and fast speed, which can be used in the prediction of soil and water loss of different project in construction stage.
该方法可操作性强,与实际结合密切,快速、精确度高,适用于各类开发建设项目施工阶段水土流失量的预测。
The box transfer story can be simplified into wall model of common girt strip, beam model of common girt strip and open-frame girder model of compound beam according to different project situations.
根据工程情况不同,可将箱形转换层简化为普通肋梁墙模型、普通肋梁梁模型和组合梁的空腹桁架模型。
The box transfer story can be simplified into wall model of common girt strip, beam model of common girt strip and open-frame girder model of compound beam according to different project situations.
根据工程情况不同,可将箱形转换层简化为普通肋梁墙模型、普通肋梁梁模型和组合梁的空腹桁架模型。
应用推荐