The test cycles associated with each attempted improvement will kill your development schedule.
与每个改进尝试相关的检验周期都会打乱开发时间表。
The team has set a tight development schedule for Unladen Swallow, making quarterly milestone releases.
开发团队为unladen Swallow制定了一个严格的时间表,将在每季发布一个里程碑。
Setting accurate and specific exit criteria for each phase is important to managing the whole development schedule.
为每个阶段设置准确而详细的退出标准对于管理整个开发进度表是十分重要的。
You will be responsible for the product development schedule and constantly finding new ways to improve existing process.
您将负责产品开发进度,并不断寻找新的途径,以改善现有的流程。
The intense around-the-clock development schedule of Apache Geronimo means that there are always a couple of developers around.
紧张的ApacheGeronimo开发计划意味着总有几个开发人员在线。
At the very least, an "unsuccessful" vertical slice migration will identify the hard problems and allow you to adjust your development schedule accordingly.
至少,一个“不成功”的垂直部分迁移将识别出难题所在并允许您相应地调整开发进度表。
The system development schedule included meetings between programmers and health care professionals who would be using the system to discuss interface design.
系统开发计划中包括程序员和使用系统的医务人员之间的多次会议,讨论界面设计。
In the case of the Avalon, which is developed and engineered in the U. S., Mr. Stephens said he is adding four weeks of testing to his development schedule.
斯蒂芬斯说,对于在美国开发和设计的“亚洲龙”,他将在开发时间表上加进四周的测试。
And time is short: if Apple follows its typical development schedule, Jobs will stride onto a stage with a second-generation tablet no later than the spring of 2011.
而且时间紧迫:如果苹果遵循其典型的研发安排,最迟到2011年春天乔布斯就会迈入第二代平板电脑的阶段。
As we explained earlier in the summer we set aside these last few months for the upgrade to our underlying Dreamworld technology platform alongside the normal development schedule.
正如我们在今年夏天早些时候说过,我们过去数月在正常时间表的同时亦在升级我们的梦幻世界技术平台。
At the same time, we offer Digital still camera, DV, Digital photo frame, PC-CAM and CCTV solution which shortens customers' development schedule and greatly enhances their product's competitiveness.
公司提供的数码相机、数码像框、DV、摄像头、家庭监控等完整解决方案,有效的帮助客户缩短了产品开发时间,同时大幅提升了产品的竞争力。
Oftentimes we feel pressure to sign up to a schedule and commit too early in the development phase.
通常在开发阶段,我们对在一个时间表签字并早早地负起责任感到压力。
If you are behind schedule and a test case breaks, you must fix it quickly or it will become a mere sparkle in the history of your development effort.
如果您落后进度了,且测试用例打破了,那么您必须快速处理否则它将成为您开发工作史上仅仅的闪光点。
Top-shelf tools may provide embedded software sizing "wizards" to assist in software sizing, the single most significant driver of development cost, effort, and schedule.
顶层的工具可能提供嵌入式的软件规模“向导”来援助软件的规模,它是影响到开发成本、工作量和进度的最重要的因素。
With development always behind schedule projects would reach the deadline and be released untested to users.
开发工作总是落后于项目时间表,面临截止期限的项目不测试就发布给用户。
This also leads to high cost due to schedule delays, development workload, and extra test effort, and can result in lower quality delivery for globalization support.
同时还会因为进度表的延迟,开发工作量的增加,以及额外的测试工作导致成本增加,并且在全球化支持方面导致低质量的交付。
It is critical to fulfill globalization requirements earlier to continuously reduce risks such as late major code changes or schedule delays for iterative and incremental development.
更早地实现全球化需求可以不断地降低风险是十分关键的,晚期在迭代和增量开发中有较大代码变更或者进度表延迟就是风险之一。
When migration is necessary, it is easier to get downtime for a development or to test LPAR during business hours than to schedule a production application outage.
当需要迁移时,让开发或测试LPAR在工作时间停机比安排在生产应用程序停机更容易。
The final schedule is now online and features 103 speakers and 107 sessions on key topics designed for senior developers, team leads, architects in enterprise software development shops.
现在大家可以在线查看最终的议程,本次大会共有103位演讲人、107个主题,面向企业软件开发领域的高级开发者、团队领导及架构师。
A daily replication schedule must be put in place and adhered to in order to keep code, data, and environment changes across all development sites in sync.
每天的复制计划必须保证所有站点的代码,数据,和环境的同步改变。
Moreover, you can leverage the invaluable engineering information captured in the DoDAF products to reduce risk to cost and schedule during systems development.
此外,您可以利用在DoDAF产品中获得的非常宝贵的工程信息来减少系统开发中成本和进度安排的风险。
To run the standard analysis rule set, the development manager USES Build Forge to automate the steps to configure, schedule, and run software analysis.
要运行标准的分析规则集,开发经理要使用BuildForge来自动化配置,配置计划表的步骤,并运行软件分析。
Workqueue interface is introduced in 2.5 development to replace the task queue interface (used to schedule kernel tasks).
工作队列接口是在2.5的开发过程中引入的,用于取代任务队列接口(用于调度内核任务)。
In this case, the batch job development is only piece of a much larger programme which is ahead of schedule.
在这种情况下,批处理工作开发只是更大程序中的一部分。
Development phases Well defined, following agreed-to schedule (although with frequent schedule overruns) No defined phases, milestones, or schedules.
开发阶段定义良好、按协议的时间表进行(但经常更新时间表)未定义阶段、里程碑或时间表。
As an example, most stakeholders would like to have an application that does exactly what they want it to do, while minimizing the application's development cost and schedule time.
作为例子,多数涉众希望应用程序可以完全实现他们想要的功能,同时最小化应用程序的开发成本和时间表。
An integrated software development platform and consistent, configurable processes and best practices are essential to mitigate risk to cost and schedule across these large projects.
一个集成的软件开发平台和一致的,结构化的过程以及良好的实践对减小风险和成本,确定大型项目的时间进度都是至关重要的。
To stay on schedule, your developers must work weekends and extra hours for extended periods, because they are the only ones who can continue new feature development and fix defects in this area.
为了按时完成工作,你的开发人员不得不为延长的产品周期而付出在周末加班的代价,因为他是这个部分唯一可以继续新特性开发和修正错误的人员。
The Mozilla team wants to switch Firefox development to a schedule-driven process to speed up releases.
Mozilla团队希望将Firefox的开发转到日程表驱动的开发流程上以加速发布速度。
The Mozilla team wants to switch Firefox development to a schedule-driven process to speed up releases.
Mozilla团队希望将Firefox的开发转到日程表驱动的开发流程上以加速发布速度。
应用推荐