Dam risk analysis is an effective means for improving and strengthening dam safety and management.
大坝风险分析将有效地提高和加强大坝安全及管理水平。
On the basis of above study, we make risk treatment analysis and present concrete risk depending measures for pouring dam construction in GongBoXia project.
根据以上分析研究,运用风险应对策略,为公伯峡堆石坝填筑施工风险防范提出具体措施。
In this paper probability analysis method is introduced in the study on earthquake risk for the dam of the project. Comparison with conventional deterministic method has been conducted.
本文将概率分析方法引用于水电站大坝的地震危险性研究,并与常规的确定性方法进行了比较。
In recent years, risk analysis techniques have proved to be a useful tool to inform dam safety management.
近年来,风险分析技术日渐成为大坝安全管理的有效工具。
So it is necessary to carry out risk analysis and risk management in pouring dam construction to display the virtues of concrete faceplate rock dam and to construct quickly.
因此,要发挥堆石坝的优势,做到快速施工,有必要针对具体的工程进行一定的风险分析与风险管理。
Overtopping is one of major factors of dam failure, and overtopping risk analysis is one important part of dam risk assessment.
洪水漫顶是导致大坝溃坝的主要原因之一,大坝洪水漫顶风险评估是大坝风险评估的重要组成部分。
Fault tree analysis is used to analyse the high arch dam risk.
利用故障树分析法对高拱坝进行风险分析。
Based on a probabilistic risk assessment and an expression for loss of life predictions in case of dam failure, a method of tolerable risk analysis for dam safety decision-making is suggested.
在阐述大坝风险率和生命损失评估方法的基础上,介绍了运用允许风险进行大坝防洪安全决策的方法。
Environment risk analysis of dam debacle in tailing pond in rainstorm for construction of phosphorite beneficiation plant with the craft of reelection-flotation was studied.
对某拟建重选-浮选工艺的磷矿选矿厂进行了尾矿库溃坝的环境风险分析。
Environment risk analysis of dam debacle in tailing pond in rainstorm for construction of phosphorite beneficiation plant with the craft of reelection-flotation was studied.
对某拟建重选-浮选工艺的磷矿选矿厂进行了尾矿库溃坝的环境风险分析。