"The first operand is the destination register and the second is the D-Form address to load."
第一个操作数是目标寄存器,第二个操作数是要加载的D -Form地址。
There appears some flexibility at the top of tower with high ratio of height to diameter (H/D), caused by wind load.
高径比(H/D)较大的塔在风载荷的作用下,在塔顶处会引起一定的静挠度。
The stress of base structure is analyzed by 3-D FEM under the action of temperature warping deformation and coupling with vehicular load.
方法结合试验路温度场监测数据,采用三维有限元法对基层结构在温度翘曲变形及与车辆荷载耦合作用下的受力特性进行分析。
A direct iterative algorithm was used to determine the kinematic limit load of the 3-d structure.
提出了一种直接迭代算法来求解三维结构的上限极限载荷。
An analysis was made on the Zhougongzhai arch dam under basic load combination and overloading of hydraulic pressure by use of 3-d nonlinear finite element method.
用三维非线性有限单元法对周公宅拱坝进行了基本荷载组合下的非线性分析和水压超载分析。
A 3-d nonlinear finite element model was established to simulate the static load test of a radial tire.
建立了一种子午线轮胎的三维非线性有限元模型,来模拟子午线轮胎的静负荷试验。
The load characteristics of a new type of hybrid excitation claw-pole alternator are computed using a three-dimensional (3-D) magnetic equivalent circuit (MEC) method.
用三维等效磁网络方法计算了一台新型混合励磁爪极发电机负载特性。
By using ABAQUS software package, this paper has done the 3-d nonlinear finite element analysis on the performance of cover plate connection under monotonic load.
采用通用有限元软件ABAQUS,对梁柱盖板连接在单调荷载作用下的受力性能进行了三维非线性有限元分析。
Hu Zhijian. Research on Load Self-adaptive Hydraulic Control System of Drill Rig [d]. Changchun: Jilin University, 2007.
[7]胡志坚。钻机负载自适应液压控制系统的研究[d]。长春:吉林大学,2007。
A plane 2-d full load mathematical model is established under the body-fitted coordinate system based on staggered grid.
在此基础上建立了正交曲线贴体坐标系下的平面二维全沙数学模型。
The load-deflection characteristics of inclined excavated foundations of transmission lines in homogeneous soil under lateral loads are analyzed using a 3-D numerical simulation model.
通过数值模拟,分析输电线路倾斜掏挖式基础在水平荷载作用下的荷载挠度特性。
The brake beam(connecting plate) is often broken, and the bolts for fixing the connecting plate are loosed due to the crane′s dynamic load when D series of crane beams are working in a steel plant.
某钢厂列吊车梁在工作中,由于吊车工作的动态作用,导致制动梁(连接板)经常发生断裂,固定连接板的螺栓松动。
The slot elements are set up to simulate slot between lining and rock mass and the 3 D elastoplastic FEM is adopted with multi stage load and changible stiffness iteration.
在压力隧洞充水运行时,对衬砌与围岩之间的接缝采用接缝空腔单元模拟。
The slot elements are set up to simulate slot between lining and rock mass and the 3 D elastoplastic FEM is adopted with multi stage load and changible stiffness iteration.
在压力隧洞充水运行时,对衬砌与围岩之间的接缝采用接缝空腔单元模拟。
应用推荐