• A new cut-fill method is adopted in the design of access road of Miaojiaba hydropower project by directly backfilling on the subgrade alluvium, and has probed a set of effective design method.

    苗家坝水电站对外公路在淤积层路段设计中采用了坡脚换填抗剪、在淤积层上直接回填路基的新方法,摸索出一套有效的设计方法。

    youdao

  • Channel deposits consisting of sand silt and clay fill the valleys cut by a river system.

    河道沉积由砂,粉沙和粘土组成,充填于河流切割的河谷之中。

    youdao

  • Channel deposits, consisting of sand, silt and clay, fill the valleys cut by a river system.

    河道沉积由砂,粉沙和粘土组成,充填于河流切割的河谷之中。

    youdao

  • Following the peasant model of equal cut and fill, our landscapes would be more energy efficient and easily constructed.

    如果我们懂得像农民那样去填挖方、去造地形,我们的景观便能更具能效。

    youdao

  • For peasants, cut and fill are simultaneous and inseparable.

    对于农民来说,填方和挖方是同时进行且不可分离的。

    youdao

  • The method discussed in this paper refers to the cut and consolidated fill method in which drilling is done by jumbo, broken ore moved by LHD unit and the filler transported by pipeline.

    该采矿法指用台车凿岩、铲运机出矿和管道输送充填料的胶结充填采矿法。

    youdao

  • I used the polygonal tool to select the cut areas and used the paint bucket tool to fill the selections with red color.

    我用多边形套索工具来选出剖切面,然后使用油漆桶工具将选区填充为红色。

    youdao

  • Main function GH-DXD series automatic filling and packing machines can automatically measure, make bags, fill, seal, cut, print codes and make easy tearing notches.

    功能概述GH - DXD系列包装机,可自动完成计量、制袋、填充、封合、切断、打印生产日期、切易撕口等工序。

    youdao

  • In some areas, coarse sediments can fill channels of streams or rivers that cut through finer grained sediments or rocks.

    在一些地区,粗粒沉积物可充填于切入较细粒的沉积物或岩石的溪流或河流的水道内。

    youdao

  • And he put the wood in order, and cut the bullock in pieces, and laid him on the wood, and said, Fill four barrels with water, and pour it on the burnt sacrifice, and on the wood.

    又在坛上摆好了柴,把牛犊切成块子放在柴上,对众人说,你们用四个桶盛满水,倒在燔祭和柴上。

    youdao

  • A cut and fill approach was used and the dirt removed for underground parking was used to make the mounds in the landscape.

    利用开凿和装填的手段,把建造地下停车场时挖出的泥土用来作为景观中的小丘。

    youdao

  • Subgrade earthwork and rockwork shall include: fill subgrade earthwork, cut subgrade, special subgrade treatment and other relevant activities.

    路基土石方工程包括:填方路基、挖方路基和特殊路基处理及其有关的作业。

    youdao

  • The upward horizontal cut and fill stoping method and the measures for safe mining are recommended.

    推荐使用机械化上向水平分层充填采矿法,提出了安全回采措施。

    youdao

  • The practice cf mining room first and then pillars by overhand cut and cemented fill is widely used in China, but the condition for pillars recovery in later period is normally worse.

    先房后柱的上向分层胶结充填法在我国应用较为广泛,但矿柱后期回采条件较差。

    youdao

  • Excellent results were obtained in mining of pillars using tailings in horizontal cut-and-fill.

    用尾砂分层充填法回采矿柱,取得了很好的经济效果。

    youdao

  • At present, cut-and-fill method is adopted in a growing number of mines. However, it is quite common that stopes roofs are unable to be tight by pipeline transport in filling.

    目前,使用充填采矿法的矿山日益增多,管道输送充填不接顶现象普遍存在。

    youdao

  • At present, cut-and-fill method is adopted in a growing number of mines. However, it is quite common that stopes roofs are unable to be tight by pipeline transport in filling.

    目前,使用充填采矿法的矿山日益增多,管道输送充填不接顶现象普遍存在。