• There are no specific design demand and computer theory of paving layer in current bridge criterion, so there are common damages on the surface.

    而现行的桥梁规范中对铺装并无具体的设计要求和计算理论,桥面铺装层纵横裂纹等破坏普遍存在。

    youdao

  • The measured values of creep coefficient are far less than that of current bridge code (JTG D62-2004), and it has the characteristics of convergence after 170 days.

    通过试验结果与现行桥规JTGD62-2004的比较得出:配筋高强混凝土徐变系数远小于规范取值,且在170天后徐变系数有收敛的特征。

    youdao

  • Besides, the current bridge and culvert design criterion takes some basic postulation during the calculation of the bridge's member in bending, which results in over-conservative numeric value.

    另外,现行的公路桥涵设计规范,在对桥梁受弯构件承载能力计算中采用了一些基本假定,导致计算结果过于保守。

    youdao

  • Besides, the current bridge and culvert design criterion takes some basic postulation during the calculation of the bridge's member in bending, which results in over-conservative numeric value.

    另外,现行的公路桥涵设计规范,在对桥梁受弯构件承载能力计算中采用了一些基本假定,导致计算结果过于保守。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定