The test lead wants to see a list of all CTCs that have been executed, along with their results.
测试领导者希望看到所有已经被执行的CTC的完整列表,以及它们的执行结果。
If there are blocked tests, you can select several CTCs simultaneously and mark them all as blocked at one time.
如果存在闭塞的测试,那么您就能够同时选择若干个CTC并且将它们一同标注为闭塞的。
The plan states the essential need to scale-up CTUs, which are attached to or near existing health centres, to provide essential treatment and triage patients with severe symptoms to CTCs.
应对计划中说明了扩大霍乱治疗科室的基本需求,这些治疗科室或附属于现有的卫生中心,或在卫生中心附近。扩大霍乱治疗科室的目的是提供基本的治疗并将重症病人分流到霍乱治疗中心。
Train control center (TCC), which belongs to one of wayside equipment, is the core safety equipment of CTCS.
车站列控中心是中国列车运行控制系统CTCS的核心安全设备,属于地面部分设备之一。
Finally, improvement of CTCS has been investigated and the results of calculation and analysis are presented.
探讨了系统的改进方案并给出计算和分析结果。
With the establishment of CTCS technique criterion, traditional idea and method of automatic block system design are impacted.
CTCS技术规范的制定,对自动闭塞设计的传统理念和方法产生了冲击。
With speeding up the construction of the passenger dedicated line with CTCS-3 train control system, it is necessary to do the research on the RBC control ability and its arrangement principle.
随着CTCS - 3级客运专线工程建设的加快,针对单个rbc的控制能力与RBC的设置原则进行研究很有必要。
Testing is an important process before the CTCS-3 being put into practice and is an essential way to ensure the safe operations of the train and improve the efficiency of the capacity of transporting.
测试是CTCS - 3级列车控制系统投入运营前的一个重要步骤,对其各方面性能进行测试,是保证列车行车安全,提高运输效率的重要手段。
Testing is an important process before the CTCS-3 being put into practice and is an essential way to ensure the safe operations of the train and improve the efficiency of the capacity of transporting.
测试是CTCS - 3级列车控制系统投入运营前的一个重要步骤,对其各方面性能进行测试,是保证列车行车安全,提高运输效率的重要手段。
应用推荐