Identify critical paths and bottlenecks early.
尽早判断出关键路径和瓶颈。
A new algorithm for finding the critical paths is proposed by using coding graph and without topological sort.
通过定义节点编码图概念,提出一种不需要拓扑排序的求解关键路径的新算法。
The deadlines of the activity instances that would be executed later were verified from the current time and the critical paths.
根据当前时间和所得到的关键路径对后续活动的截止期限进行了动态验证。
The method takes courses relation, time parameters, critical paths, critical courses and relative situation into account, then gives some flexible courses schemes.
该方法在综合考虑课程衔接关系、时间参数、关键线路、关键课程及相关约束的基础上,制定了灵活的专业课程排课计划。
The total float time is one of the important time parameters for a working task, and also is the basis for ascertaining critical work and critical paths in network planning.
工作的总时差是工作的最主要时间参数之一,是网络图中关键工作和关键线路的判别依据。
The study shows that the critical paths for the nuclear power project are from NI civil work, NI erection, commissioning of single systems directly serving the CFT to the joint-test.
分析表明,核电工程建设的关键路径是核岛土建、核岛安装、与一回路冷态调试相关的单系统调试及联合调试。
This text has analysed three algorithms for finding the critical paths from several respects separately, such as complexity of the algorithm, the structure form of the data and easy degree.
本文分别从算法复杂度、数据结构形式及实现的容易程度等几方面分析了三种求关键路径算法的优劣。
Based on the concepts of both critical paths and suberitical paths. a model for the least cost scheduling in network project is built, and a new algorithm for solving this model is proposed.
本文基于关键路线和次关键路线的概念,建立了网络计划最低成本日程的模型,并提出一种求解该模型的新算法。理论分析和实际计算表明,它简单、易行、效果好。
Critical paths are usually obtained by topological collating.
关键路径通常是在拓扑排序的基础上求得的。
Critical paths are usually obtained by topological collating.
关键路径通常是在拓扑排序的基础上求得的。
应用推荐