Faster access to critical fixes with standard revisions: Premium or Premium Plus customers can request their critical fix to be considered for the next available revision or update.
带标准修订的对关键修正的快速访问:Premium或PremiumPlus客户可以要求在下一修订或升级版中考虑关键修正。
They are the ones who, right in the middle of a critical meeting, are expected to instantly fix the projector that's no longer working.
在关键会议中,人们希望他们能够立即修复好故障的投影仪。
This can be useful in those critical situations where you need to at least temporarily fix an urgent SQL problem but cannot wait for a fix from a vendor or developer.
这种方法对于一些关键情况很有用,在那些情况下,您至少需要修复一个紧急SQL问题,但等不及供应商或开发人员提供修复程序。
In a scenario with multiple files, you can imagine that the suspended changes might not have conflicted with those necessary to fix the critical bug.
在具有多个文件的场景中,可以想象到,挂起的更改可能不会与修复关键错误所必需的更改相冲突。
Instead, he will suspend his change set, deliver a fix for the critical bug, and then resume his original change set to continue what he was doing before.
相反,他将挂起自己的更改,交付该关键错误的修复,然后恢复原先的更改集以继续进行先前所做的更改。
Interim fixes apply to a specific version of a software package and typically fix a single or several small critical issues.
将应用于软件包的具体版本,并修复单个或几个小的关键问题。
If you do, it will be impossible to fix the vast majority of the critical usability problems that the test uncovers.
由于测试没有覆盖到,这样的话就不可能修复大多数严重的可用性问题。
In addition they tag every release and in the event of a critical bug can go back to fix it.
另外,他们还会为每一个版本打上标记,一旦发生严重的bug可以回溯到原来的版本进行修复。
If you find cases like this, where the fix may be critical for your application, you can get the modified files from the nightly builds (see the Dojo toolkit link in Resources).
如果您遇到与此类似的情况,即这种修复对您的应用程序十分关键,那么您可以从每夜构建(nightly builds)获得这些修改后的文件(参见参考资料内的Dojo工具箱链接)。
Within that team do you assign some developers to release 2.0, others to 1.5 and steal time from Joe (the sacrificial developer) to fix critical issues in 1.0?
在这样的团队中,是否该让某些开发人员发布2.0版本,其他人从事1.5版本的工作,并让Joe(具有牺牲精神的开发人员)挤出时间来修复1.0版本的重要问题?
The way to fix this is to think about process improvement: how are critical decisions made?
解决途径在于思考如何改进流程:即关键决策是如何做出的?
But when the brain senses imbalance-and particularly when it thinks you're sinking-it goes into critical mode and nearly 100 percent of its energy is consumed with trying to fix that.
但是如果大脑监测到身体处于不平衡的状态,特别是它认为你在下沉的时候,几乎100%的大脑能量会用来解决这个问题。
Critical technologies related to fix topology method, linear friend-network method and so on were analyzed in detail.
详细分析了固定拓扑法、线性化友网络法等涉及到的关键技术。
Critical technologies related to fix topology method, linear friend-network method and so on were analyzed in detail.
详细分析了固定拓扑法、线性化友网络法等涉及到的关键技术。
应用推荐