According to the viewpoints of the probability and mathematical statistics, critical duration, critical activity and critical line are re - defined, and particular method is put forward for it.
并提出解决问题的三种具体措施,从概率论与数理统计的角度,对关键线路和关键工作进行了重新定义和确定的方法。
To reduce the duration, select only the most critical tables.
若要缩短持续时间,请只选择最关键的表。
A weighted critical path algorithm was provided to calculate the expectation value of the workflow's duration, record the process of reduction, and identify the time-oriented critical path.
通过加权关键路径算法,可以计算工作流完成时间的期望值及记录约简过程中的中间结果,从而确定工作流模型的关键路径。
Designed for maximum durability, it ensures critical engine components are protected for the duration of the race.
最大的耐用性设计,它可以确保发动机的关键部件均会获得保障了比赛的时间。
The methods of identifying critical chain with the goals of minimum project duration and duration-cost tradeoff are put forward. Finally a scheduling example is given to prove the methods' validity.
然后,以工期最小为目标与工期-成本权衡目标建立关键链识别方法模型,并通过算例验证了该方法的有效性。
Each presentation is a critical review of the required paper or book section and is 15-20 minutes in duration.
每次报告包含要求阅读的论文或书籍部份章节的评论,时间是十五至二十分钟。
Each presentation is a critical review of the required paper or book section and is 15-20 minutes in duration.
每次报告包含要求阅读的论文或书籍部份章节的评论,时间是十五至二十分钟。