The arch rib have been fabricated longitudinal by 7 segments, and used the non-support cable crane installation and the steel cable diagonal-tension method.
拱肋纵向分7段预制,采用无支架缆索吊机安装、钢丝绳斜拉扣挂法施工。
Designing a floating crane installation.
移动式起重机船用安装的设计。
Designing a floating crane installation.
移动式起重机船用安装的设计。
应用推荐